Crossref DOIMemberCiteFactoropen accessissn
SJIF Impact Factor 8.659 | ISSN: 2582-3930
IJSREM Logo

International Journal of Scientific Research in Engineering and Management

(Gateway to Global Scholars - An International, Scholarly, Multi-Disciplinary, Open Access Journal)

Peer-Reviewed Journal Designed to Meet UGC's Quality Parameters

HomeCurrent IssuePast IssuesPay OnlineConferencesEditorial BoardAbout UsContact Us
IJSREM

Loading article...

Follow Us

  • Google Scholar
  • ResearchGate
  • Academia.edu
  • Mendeley
  • LinkedIn
  • Facebook
  • Instagram

Journal Policies

  • Peer Review Policy
  • Publication Ethics
  • Copyright Infringement
  • Refund & Cancellation Policy
  • Terms and Conditions
  • Privacy Policy

Journal Identifiers & Licenses

  • ISSN Verified: 2582-3930ISSN Verified: 2582-3930
  • Crossref DOI: 10.55041Crossref DOI: 10.55041
  • SJIF Ranking: 08.659SJIF Ranking: 08.659
  • Licensed under CC BY 4.0Licensed under CC BY 4.0
  • ISO Certification: 9001:2015ISO Certification: 9001:2015
  • Indexed & Cited In: Google ScholarIndexed & Cited In: Google Scholar

Contact Us

International Journal of Scientific Research in Engineering and Management (IJSREM)

#62/1, New No 7, 1st Cross, 2nd Main, Ganganagar, R T Nagar, Bangalore North, Bangalore, Karnataka, India – 560032
[email protected]+91 93911 67991
logos
logos
Working Hours

Mon – Sat: 9:00 AM – 6:00 PM

Sunday: 10:00 AM – 4:00 PM

+91 93911 67991

© 2026 IJSREM – International Journal of Scientific Research in Engineering and Management. This is an open-access journal. Articles are published under the Creative Commons Attribution (CC BY 4.0) License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

DisclaimerPrivacy PolicyTerms and Conditions
ArticlePeer ReviewedOpen AccessPlagiarism Passed
Paper ID:10.55041/IJSREM28226

A Comparative Study of Time and Cost Optimization in Project Management: Primavera P6 & Linear Programming with Lingo Solver

Stream/Area:

-

Subject:

-

Paper ID:

10.55041/IJSREM28226

Volume:

8 |

1 |

Jan 2024

Pages:

Publication Frequency:

Monthly (12 issues per year)

DOI
Digital Object Identifier
10.55041/IJSREM28226

License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.

Share this article:

Authors

KRK

Kirti R. Kumbhar

MSD

Mamta S. Dawale

PPP

Pooja P. Patil

PSP

Prof. Swapnil Patare

Author Services & Downloads

Full Articles

Abstract

In an effort to boost efficiency and reduce costs, computer-based solutions have become more popular for project management. Although Primavera P6 and other traditional tools have proved essential for project planning and control, difficulties still arise with complicated projects. An innovative approach is provided by the development of mathematical optimization techniques, especially Linear Programming (LP) with programmes like Lingo Solver. The purpose of this study is to compare the time and cost optimization of Primavera P6 and Lingo Solver’s LP. The goals are to analyse the advantages and disadvantages, evaluate the effectiveness and adaptability, and offer useful information to decision-makers. Application of Lingo Solver’s LP is found to significantly reduce project duration, with a significant impact on cost trends. On the other hand, Primavera P6 shows that project duration can be reduced while maintaining the same level of cost. The study highlights how the duration of the project, additional indirect expenses, and costs interplay dynamically throughout the duration of the project. This research provides useful insights to the continuing discussion on project management methodologies by bridging the gap between conventional project management tools and advanced optimization techniques. This will help decision-makers overcome the complexities of project optimization for optimal results in practical applications.

KEYWORDS

Optimization Construction project Linear programming Primavera p6 Lingo Project management Mathematical model Time-cost trade-off.

Cite This Article

Kirti R. Kumbhar, Mamta S. Dawale, Pooja P. Patil, Prof. Swapnil Patare, "A Comparative Study of Time and Cost Optimization in Project Management: Primavera P6 & Linear Programming with Lingo Solver," International Journal of Scientific Research in Engineering and Management, vol. 8, no. 1, Jan 2024. https://doi.org/10.55041/IJSREM28226

Full Article/Conclusion

References

Editorial & Review Transparency

Publication Date

12/31/45309

Peer Review Type

Double-Blind Peer Review

Review Rounds: 2

Documents

Review Report (Confidential)
Copyright Form (Office)

Article Metrics & Impact

Article Views

0

Total views since publication

PDF Downloads

1

Total downloads since publication

Geographic Reach

5

Indexing, Archiving & Preservation

Google Scholar
Academia
ResearchGate
Crossref
SSRN
Semantic Scholar
Thomson Reuters
WorldCat
Mendeley
OpenAlex
EBSCO
Zenodo

Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.

Ethics, Compliance & Transparency

Plagiarism Screening

This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.

Conflict of Interest

The authors declare no conflict of interest related to this research work.

Funding Information

No funding information available for this research.

Similar & Recommended Articles

Similar Articles by Topic

Related research in the same subject area

Loading similar articles...