Crossref DOIMemberCiteFactoropen accessissn
SJIF Impact Factor 8.659 | ISSN: 2582-3930
IJSREM Logo

International Journal of Scientific Research in Engineering and Management

(Gateway to Global Scholars - An International, Scholarly, Multi-Disciplinary, Open Access Journal)

Peer-Reviewed Journal Designed to Meet UGC's Quality Parameters

HomeCurrent IssuePast IssuesPay OnlineConferencesEditorial BoardAbout UsContact Us
IJSREM

Loading article...

Follow Us

  • Google Scholar
  • ResearchGate
  • Academia.edu
  • Mendeley
  • LinkedIn
  • Facebook
  • Instagram

Journal Policies

  • Peer Review Policy
  • Publication Ethics
  • Copyright Infringement
  • Refund & Cancellation Policy
  • Terms and Conditions
  • Privacy Policy

Journal Identifiers & Licenses

  • ISSN Verified: 2582-3930ISSN Verified: 2582-3930
  • Crossref DOI: 10.55041Crossref DOI: 10.55041
  • SJIF Ranking: 08.659SJIF Ranking: 08.659
  • Licensed under CC BY 4.0Licensed under CC BY 4.0
  • ISO Certification: 9001:2015ISO Certification: 9001:2015
  • Indexed & Cited In: Google ScholarIndexed & Cited In: Google Scholar

Contact Us

International Journal of Scientific Research in Engineering and Management (IJSREM)

#62/1, New No 7, 1st Cross, 2nd Main, Ganganagar, R T Nagar, Bangalore North, Bangalore, Karnataka, India – 560032
[email protected]+91 93911 67991
logos
logos
Working Hours

Mon – Sat: 9:00 AM – 6:00 PM

Sunday: 10:00 AM – 4:00 PM

+91 93911 67991

© 2026 IJSREM – International Journal of Scientific Research in Engineering and Management. This is an open-access journal. Articles are published under the Creative Commons Attribution (CC BY 4.0) License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

DisclaimerPrivacy PolicyTerms and Conditions
ArticlePeer ReviewedOpen AccessPlagiarism Passed
Paper ID:IJSREM33617

Project Scheduling

Stream/Area:

-

Subject:

-

Paper ID:

IJSREM33617

Volume:

8 |

11 |

Nov 2024

Pages:

Publication Frequency:

Monthly (12 issues per year)

DOI
Digital Object Identifier
Not assigned

License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.

Share this article:

Authors

DHK

Dinesh Haraksingh Koranga

MS

Mr. S.B.Waghole

Author Services & Downloads

Full Articles

Abstract

Efficiency of the scheduling of construction projects is a critical factor that determines timely and cost-effective completion of a project. The paper examines the key issues of scheduling of construction projects in the City of Kolhapur in terms of operation and management. A fuzzy Hierarchical (elimination) approach supported by Relative Importance Index (RII) technique was carried out to discuss survey of engineers and project managers on the prioritization of delay causes on 24 major construction phases. The elements of real-time oversight, skill-based labor distribution and communications were stressed by the engineers whereas the essential aspects of timely decision-making, material supply, and funding transfers were stressed by the project manager. To add to this was five real life case studies, the most common stages that were delay dominated were the following, Footing & Raft Work, Masonry and Finishing activities. Its results indicate that inefficiencies in schedules are inherent, given inappropriate planning of resources, unresponsive surveys, and improper organization. Those delay factors that are high impact, as defined using RII (e.g., RII= 0.817 in terms of inspection frequency and RII= 0.800 in terms of speed of decision making), associate with disruptions on the critical path. To address such setbacks, the research provides a model of strategic measures such as digital tools (BIM, IoT), lean construction, sophisticated procurement systems, as well as the collaborative methods of contracting architecture, and prefab building. These indicators are to change the construction scheduling models of Kolhapur to predictive, sustainable, and efficient execution of projects.

KEYWORDS

Construction Scheduling Delay Analysis Lean Construction Project Management Relative Importance Index (RII) Risk Mitigation.

Cite This Article

Dinesh Haraksingh Koranga, Mr. S.B.Waghole, "Project Scheduling," International Journal of Scientific Research in Engineering and Management, vol. 8, no. 11, Nov 2024.

Full Article/Conclusion

References

Editorial & Review Transparency

Publication Date

8/17/2025

Peer Review Type

Double-Blind Peer Review

Review Rounds: 2

Documents

Review Report (Confidential)
Copyright Form (Office)

Article Metrics & Impact

Article Views

0

Total views since publication

PDF Downloads

2

Total downloads since publication

Geographic Reach

5

Indexing, Archiving & Preservation

Google Scholar
Academia
ResearchGate
Crossref
SSRN
Semantic Scholar
Thomson Reuters
WorldCat
Mendeley
OpenAlex
EBSCO
Zenodo

Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.

Ethics, Compliance & Transparency

Plagiarism Screening

This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.

Conflict of Interest

The authors declare no conflict of interest related to this research work.

Funding Information

No funding information available for this research.

Similar & Recommended Articles

Similar Articles by Topic

Related research in the same subject area

Loading similar articles...