Loading article...
Loading article...
Stream/Area:
-
Subject:
-
Paper ID:
IJSREM19705
Volume:
7 |
4 |
Apr 2023
Pages:
Publication Frequency:
Monthly (12 issues per year)
License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.
It is known that civil engineering deals with the design, maintenance and construction of physical and naturally built environment, including works like bridges, roads, canals, dams and buildings. Construction of bridge has always been one of the most interesting challenges to all civil engineers. Materials such as timber, iron, steel, and concrete has been used to construct the bridge. Physical obstacles like roads and railway tracks are span by building a pedestrian bridge structure. Traffic can be eliminated by construction of bridges to reduce the delay at highways and conflict between pedestrians and motor vehicles. Various loads and combinations are included in frame analysis which also includes the lateral loads. Construction of foot over bridge is designed solely for pedestrians as it ensures people collision free crossing from one side to another side of the road and railway platforms.
KEYWORDS
Publication Date
4/29/2023
Peer Review Type
Double-Blind Peer Review
Review Rounds: 2
Documents
Article Views
0
Total views since publication
PDF Downloads
1
Total downloads since publication
Geographic Reach
5
Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.
Plagiarism Screening
This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.
Conflict of Interest
The authors declare no conflict of interest related to this research work.
Funding Information
No funding information available for this research.
Related research in the same subject area
Loading similar articles...