Crossref DOIMemberCiteFactoropen accessissn
SJIF Impact Factor 8.659 | ISSN: 2582-3930
IJSREM Logo

International Journal of Scientific Research in Engineering and Management

(Gateway to Global Scholars - An International, Scholarly, Multi-Disciplinary, Open Access Journal)

Peer-Reviewed Journal Designed to Meet UGC's Quality Parameters

HomeCurrent IssuePast IssuesPay OnlineConferencesEditorial BoardAbout UsContact Us
IJSREM

Loading article...

Follow Us

  • Google Scholar
  • ResearchGate
  • Academia.edu
  • Mendeley
  • LinkedIn
  • Facebook
  • Instagram

Journal Policies

  • Peer Review Policy
  • Publication Ethics
  • Copyright Infringement
  • Refund & Cancellation Policy
  • Terms and Conditions
  • Privacy Policy

Journal Identifiers & Licenses

  • ISSN Verified: 2582-3930ISSN Verified: 2582-3930
  • Crossref DOI: 10.55041Crossref DOI: 10.55041
  • SJIF Ranking: 08.659SJIF Ranking: 08.659
  • Licensed under CC BY 4.0Licensed under CC BY 4.0
  • ISO Certification: 9001:2015ISO Certification: 9001:2015
  • Indexed & Cited In: Google ScholarIndexed & Cited In: Google Scholar

Contact Us

International Journal of Scientific Research in Engineering and Management (IJSREM)

#62/1, New No 7, 1st Cross, 2nd Main, Ganganagar, R T Nagar, Bangalore North, Bangalore, Karnataka, India – 560032
[email protected]+91 93911 67991
logos
logos
Working Hours

Mon – Sat: 9:00 AM – 6:00 PM

Sunday: 10:00 AM – 4:00 PM

+91 93911 67991

© 2026 IJSREM – International Journal of Scientific Research in Engineering and Management. This is an open-access journal. Articles are published under the Creative Commons Attribution (CC BY 4.0) License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

DisclaimerPrivacy PolicyTerms and Conditions
ArticlePeer ReviewedOpen AccessPlagiarism Passed
Paper ID:10.55041/IJSREM28143

ANALYZE THE TIME AND COST IN SURVEYING WITH DIFFERENT TYPES OF INSTRUMENTS USED IN THE FIELD OF LEVELLING

Stream/Area:

-

Subject:

-

Paper ID:

10.55041/IJSREM28143

Volume:

8 |

1 |

Jan 2024

Pages:

Publication Frequency:

Monthly (12 issues per year)

DOI
Digital Object Identifier
10.55041/IJSREM28143

License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.

Share this article:

Authors

RM

RAM MEHAR

Author Services & Downloads

Full Articles

Abstract

In surveying engineering we are finding leveling with different instruments in various different field works. So, I am working on different and different instrument finding leveling in surveying. On ours construction industry various instrument are use in leveling likes as Auto level, Dumpy level, Theodolite and total station. In this all instrument we finding leveling in field works like as road, railways, building, sewerage line etc. In this chapter we discuss how to find out leveling and what is easy process in different condition. In this process I am analysis various situations like as project cost, timing. If the project’s cost is high likes as working on national highway or express way and timing of the projects is less in this case I am using total station because of the total station is fastest process of doing working on such types of works. If we are using auto level / dumpy level on that condition we are not comfortable with this instruments because of timing is more required at this projects. But another project likes as a streets making of 100m/200m. In this condition we have not prefer total station because of that condition I am able to working with total station. Total station is required skill labors and the cost of total station is very high as comparisons of auto level /dumpy level and operating system of auto level / dumpy level is to easy as comparison of auto level. If we are working a small projects or low cost project like as 5-10 lakh so, that condition we are not effort total station and skills workers because of the project cost is low as comparison of expanses.

KEYWORDS

Auto level Dumpy level Theodolite Total station.

Cite This Article

RAM MEHAR, "ANALYZE THE TIME AND COST IN SURVEYING WITH DIFFERENT TYPES OF INSTRUMENTS USED IN THE FIELD OF LEVELLING," International Journal of Scientific Research in Engineering and Management, vol. 8, no. 1, Jan 2024. https://doi.org/10.55041/IJSREM28143

Full Article/Conclusion

References

Editorial & Review Transparency

Publication Date

12/31/45304

Peer Review Type

Double-Blind Peer Review

Review Rounds: 2

Documents

Review Report (Confidential)
Copyright Form (Office)

Article Metrics & Impact

Article Views

1

Total views since publication

PDF Downloads

4

Total downloads since publication

Geographic Reach

5

Indexing, Archiving & Preservation

Google Scholar
Academia
ResearchGate
Crossref
SSRN
Semantic Scholar
Thomson Reuters
WorldCat
Mendeley
OpenAlex
EBSCO
Zenodo

Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.

Ethics, Compliance & Transparency

Plagiarism Screening

This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.

Conflict of Interest

The authors declare no conflict of interest related to this research work.

Funding Information

No funding information available for this research.

Similar & Recommended Articles

Similar Articles by Topic

Related research in the same subject area

Loading similar articles...