Loading article...
Loading article...
Stream/Area:
-
Subject:
-
Paper ID:
10.55041/IJSREM31373
Volume:
8 |
4 |
Apr 2024
Pages:
Publication Frequency:
Monthly (12 issues per year)
License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.
The railway gate is to be controlled so that the road traffic is to be predicted the railway gate is to be closed when a train is passing by the way. The opening and closing of the gate is to be done using stepper motors and this stepper motor is controlled by micro controller. The signalling of the train is also controlled depending upon the gate position. Only when gate is closed the green signal is otherwise red signal. So, in this project the railway signalling includes the gate control is done using microcontroller. The automatic opening and closing of the gate and also the signalling which depending on the gate position that will be controlled by the microcontroller.
KEYWORDS
Publication Date
12/31/45404
Peer Review Type
Double-Blind Peer Review
Review Rounds: 2
Documents
Article Views
0
Total views since publication
PDF Downloads
1
Total downloads since publication
Geographic Reach
5
Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.
Plagiarism Screening
This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.
Conflict of Interest
The authors declare no conflict of interest related to this research work.
Funding Information
No funding information available for this research.
Related research in the same subject area
Loading similar articles...