Loading article...
Loading article...
Stream/Area:
-
Subject:
-
Paper ID:
IJSREM68876
Volume:
10 |
11 |
Nov 2026
Pages:
1-4
Publication Frequency:
Monthly (12 issues per year)
License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.

Electrical Engineering
Government Polytechnic Karad

Electrical Engineering
Government Polytechnic Karad

Electrical Engineering
Government Polytechnic Karad

Electrical Engineering
Government Polytechnic Karad

Electrical Engineering
Government Polytechnic Karad

Electrical Engineering
Government Polytechnic Karad
This study sizes a lead-acid battery for a proposed 1 kWp solar and pedal hybrid system with grid backup. The system serves four IP cameras and their recording and network equipment, with scheduled lighting and USB charging. Equipment demand is estimated at 2.444 kWh per day. The 15-hour overnight outage case requires 1.460 kWh, including an assumed 10 W auxiliary allowance. An analytical sizing calculation and a one-minute Python simulation use a 50% state-of-charge floor and 90% delivery efficiency. Under the design stress case of 80% retained capacity and 90% starting charge, the calculated minimum nominal capacity is 422.5 Ah at 12 V. A proposed 450 Ah bank meets the simulated load with zero unmet energy and finishes at 52.4% state of charge. A 400 Ah bank under the same conditions leaves 77.6 Wh unmet. At four equivalent sun-hours, the array could yield 3.000 kWh per day before charge limits and dispatch losses. A separate dispatch simulation evaluates how solar timing and charging limits affect grid dependence. The outage results were independently checked against the analytical energy balance at one-minute and five-minute time steps.
KEYWORDS
The 450 Ah bank serves the full 15-hour simulated load at 80% retained capacity and 90% starting charge. The verified 95.2 Wh margin depends on starting charge, auxiliary demand and usable battery capacity. The dispatch study shows that a low-solar day can leave insufficient evening charge even with the selected bank.
[1] Department of Electrical Engineering, Government Polytechnic Karad, “Design and Development of an IoT-Based Solar and Exercise-Cycle Hybrid Power Generation System with MSEDCL Backup,” internal project report, Nov. 2026. [2] Espressif Systems, “Arduino ESP32 Documentation.” [Online]. Available: https://docs.espressif.com/projects/arduino-esp32/en/latest/ [3] Texas Instruments, “INA226 High-Side or Low-Side Measurement, Bi-Directional Current and Power Monitor,” datasheet. [Online]. Available: https://www.ti.com/product/INA226
Publication Date
11/10/2026
Peer Review Type
Double-Blind Peer Review
Review Rounds: 2
Documents
Article Views
1
Total views since publication
PDF Downloads
2
Total downloads since publication
Geographic Reach
5
Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.
Plagiarism Screening
This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.
Conflict of Interest
The authors declare no conflict of interest related to this research work.
Funding Information
No funding information available for this research.
Related research in the same subject area
Loading similar articles...