Loading article...
Loading article...
Stream/Area:
-
Subject:
-
Paper ID:
10.55041/IJSREM25660
Volume:
7 |
9 |
Sep 2023
Pages:
Publication Frequency:
Monthly (12 issues per year)
License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.
Nigeria’s expanding need for electricity has necessitated a review of all available electricity producing methods, particularly renewable ones. It is well known that a significant byproduct of anaerobic digestion of human waste is methane gas, which can be burned to produce power. This study gives a clearly stated approach to the process of estimating the amount of power that can be generated from a specific volume of human waste. This essay offers a clearly thought-out method for calculating how much electricity may be produced from a given volume of human feces. The Federal University of Technology, Owerri’s analysis of data from a student residence pit toilet reveals that the case study area’s daily biomass waste availability is 3.66 tonnes, and the bimonthly biogas accruable is 154.76 kg, enough to power a 5 KW biogas generator for six (6) days.
KEYWORDS
Publication Date
12/8/2023
Peer Review Type
Double-Blind Peer Review
Review Rounds: 2
Documents
Article Views
3
Total views since publication
PDF Downloads
4
Total downloads since publication
Geographic Reach
5
Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.
Plagiarism Screening
This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.
Conflict of Interest
The authors declare no conflict of interest related to this research work.
Funding Information
No funding information available for this research.
Related research in the same subject area
Loading similar articles...