Crossref DOIMemberCiteFactoropen accessissn
SJIF Impact Factor 8.659 | ISSN: 2582-3930
IJSREM Logo

International Journal of Scientific Research in Engineering and Management

(Gateway to Global Scholars - An International, Scholarly, Multi-Disciplinary, Open Access Journal)

Peer-Reviewed Journal Designed to Meet UGC's Quality Parameters

HomeCurrent IssuePast IssuesPay OnlineConferencesEditorial BoardAbout UsContact Us
IJSREM

Loading article...

Follow Us

  • Google Scholar
  • ResearchGate
  • Academia.edu
  • Mendeley
  • LinkedIn
  • Facebook
  • Instagram

Journal Policies

  • Peer Review Policy
  • Publication Ethics
  • Copyright Infringement
  • Refund & Cancellation Policy
  • Terms and Conditions
  • Privacy Policy

Journal Identifiers & Licenses

  • ISSN Verified: 2582-3930ISSN Verified: 2582-3930
  • Crossref DOI: 10.55041Crossref DOI: 10.55041
  • SJIF Ranking: 08.659SJIF Ranking: 08.659
  • Licensed under CC BY 4.0Licensed under CC BY 4.0
  • ISO Certification: 9001:2015ISO Certification: 9001:2015
  • Indexed & Cited In: Google ScholarIndexed & Cited In: Google Scholar

Contact Us

International Journal of Scientific Research in Engineering and Management (IJSREM)

#62/1, New No 7, 1st Cross, 2nd Main, Ganganagar, R T Nagar, Bangalore North, Bangalore, Karnataka, India – 560032
[email protected]+91 93911 67991
logos
logos
Working Hours

Mon – Sat: 9:00 AM – 6:00 PM

Sunday: 10:00 AM – 4:00 PM

+91 93911 67991

© 2026 IJSREM – International Journal of Scientific Research in Engineering and Management. This is an open-access journal. Articles are published under the Creative Commons Attribution (CC BY 4.0) License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

DisclaimerPrivacy PolicyTerms and Conditions
ArticlePeer ReviewedOpen AccessPlagiarism Passed
Paper ID:IJSREM37617

Comparative Study of Cost Estimation Techniques for Hydropower Projects

Stream/Area:

-

Subject:

-

Paper ID:

IJSREM37617

Volume:

8 |

9 |

Sep 2024

Pages:

Publication Frequency:

Monthly (12 issues per year)

DOI
Digital Object Identifier
Not assigned

License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.

Share this article:

Authors

DKD

Dhirendra Kumar Das

VM

Vanshika Muchhara

Author Services & Downloads

Full Articles

Abstract

This research paper considers a comparison done on cost estimation techniques applicable to hydropower projects. Considering traditional methods of analogous, parametric, and bottom-up estimating techniques, and modern approaches like cost-benefit analysis, risk-based estimation, artificial intelligence, and Monte Carlo simulation, this study was supposed to bring out the relative strengths and weaknesses of each technique and show under what project scenarios such techniques are applicable. This will enable the study to delve into minute detail, compare the techniques for accuracy, precision, efficiency, and best fit concerning project characteristics through a rigorous analysis of existing literature supported by empirical data from surveys and interviews with industry experts. The research culminates in the development of a practical framework that will offer guidelines for choosing the best cost estimation technique that fits a particular project and its related factors, hence enabling the stakeholders to make informed decisions and avoid financial risks that surround hydropower development.

KEYWORDS

Hydropower Projects Cost Estimation Techniques Comparisons Accuracy Reliability Decision-Making Applicability

Cite This Article

Dhirendra Kumar Das, Vanshika Muchhara, "Comparative Study of Cost Estimation Techniques for Hydropower Projects," International Journal of Scientific Research in Engineering and Management, vol. 8, no. 9, Sep 2024.

Full Article/Conclusion

References

Editorial & Review Transparency

Publication Date

9/27/2024

Peer Review Type

Double-Blind Peer Review

Review Rounds: 2

Documents

Review Report (Confidential)
Copyright Form (Office)

Article Metrics & Impact

Article Views

0

Total views since publication

PDF Downloads

2

Total downloads since publication

Geographic Reach

5

Indexing, Archiving & Preservation

Google Scholar
Academia
ResearchGate
Crossref
SSRN
Semantic Scholar
Thomson Reuters
WorldCat
Mendeley
OpenAlex
EBSCO
Zenodo

Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.

Ethics, Compliance & Transparency

Plagiarism Screening

This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.

Conflict of Interest

The authors declare no conflict of interest related to this research work.

Funding Information

No funding information available for this research.

Similar & Recommended Articles

Similar Articles by Topic

Related research in the same subject area

Loading similar articles...