Comprehensive Review of Sewage Treatment Plant for Environmental Engineering
1Prof.N.A. Malokar, 2Dr.A.W.Kharche, 3Yogesh Jaware, 4Shubham Patil, 5Manish Patil
1Assistant Professor, Department of Civil Engineering, Padm. Dr. V. B. Kolte College of Engineering, Malkapur
2Professor, Department of Civil Engineering, Padm. Dr. V. B. Kolte College of Engineering, Malkapur
3,4,5 Student, Department of Civil Engineering, Padm. Dr. V. B. Kolte College of Engineering, Malkapur
ABSTRACT- Buldhana Municipality has been upgraded with Corporation status. The steady incremental in the city population results in the increase of domestic sewage generation. But still now there is no treatment plant. So it is required to construct a Sewage Treatment Plant with sufficient capacity to treat the increased sewage. The project deals with the design of the Sewage Treatment plant and its major components such screening chamber, grit chamber, skimming tank, sedimentation tank, secondary clarifier, active sludge tank and sludge drying beds. The project covers the 10.54 sq.km, Buldhana Municipal Corporation for next 30 years and its increased population. Buldhana City, the Head Quarters of the Buldhana District is (Maharastra, India). With regard to Buldhana, almost the entire town and environment are plain and the general slope is from North to East. The town is situated at the altitude of 20°59°N latitude and 75°E longitude. The soil of the area is being gravel, rocky and a large proportion of sand and gravel. All the aspects of Jalgaon climate and topography, its population growth rate is to be considered while designing the project. By the execution of the project the entire sewage of the city can be treated effectively and efficiently.
Keywords: General Terms:- Sewage Treatment Plant(STP), Wastewater Treatment,Effluent Treatment, Domestic Sewage, Industrial Wastewater, Water Pollution Control, Sanitation Engineering