Loading article...
Loading article...
Stream/Area:
-
Subject:
-
Paper ID:
IJSREM15606
Volume:
6 |
7 |
Jul 2022
Pages:
Publication Frequency:
Monthly (12 issues per year)
License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.
this paper describes the rehabilitation on of jetty in Mumbai harbour. The structure was constructed in early 1990’s and there were no as such drawings of jetty structure available. The jetty was in a deteriorated state and as a apart of audit inspection a very thorough investigation was carried out to determine the state of deterioration and to developed a design for rehabilitation thereof. From the investigations it was found that the concrete used for jetty was of high quality and the cover depths to most areas exceeded 50 mm. however some parts of structure suffer severe chloride contamination, corrosion to reinforcement, spalling of concrete etc. over years the repairs provided have been deteriorated and are now unworthy to offer any protection to structure. The methods proposed are to be employed to rehabilitate jetty patch repair, recasting of the structural areas, replacement of reinforcement etc.
KEYWORDS
Publication Date
7/13/2022
Peer Review Type
Double-Blind Peer Review
Review Rounds: 2
Documents
Article Views
0
Total views since publication
PDF Downloads
1
Total downloads since publication
Geographic Reach
5
Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.
Plagiarism Screening
This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.
Conflict of Interest
The authors declare no conflict of interest related to this research work.
Funding Information
No funding information available for this research.
Related research in the same subject area
Loading similar articles...