Crossref DOIMemberCiteFactoropen accessissn
SJIF Impact Factor 8.659 | ISSN: 2582-3930
IJSREM Logo

International Journal of Scientific Research in Engineering and Management

(Gateway to Global Scholars - An International, Scholarly, Multi-Disciplinary, Open Access Journal)

Peer-Reviewed Journal Designed to Meet UGC's Quality Parameters

HomeCurrent IssuePast IssuesPay OnlineConferencesEditorial BoardAbout UsContact Us
IJSREM

Loading article...

Follow Us

  • Google Scholar
  • ResearchGate
  • Academia.edu
  • Mendeley
  • LinkedIn
  • Facebook
  • Instagram

Journal Policies

  • Peer Review Policy
  • Publication Ethics
  • Copyright Infringement
  • Refund & Cancellation Policy
  • Terms and Conditions
  • Privacy Policy

Journal Identifiers & Licenses

  • ISSN Verified: 2582-3930ISSN Verified: 2582-3930
  • Crossref DOI: 10.55041Crossref DOI: 10.55041
  • SJIF Ranking: 08.659SJIF Ranking: 08.659
  • Licensed under CC BY 4.0Licensed under CC BY 4.0
  • ISO Certification: 9001:2015ISO Certification: 9001:2015
  • Indexed & Cited In: Google ScholarIndexed & Cited In: Google Scholar

Contact Us

International Journal of Scientific Research in Engineering and Management (IJSREM)

#62/1, New No 7, 1st Cross, 2nd Main, Ganganagar, R T Nagar, Bangalore North, Bangalore, Karnataka, India – 560032
[email protected]+91 93911 67991
logos
logos
Working Hours

Mon – Sat: 9:00 AM – 6:00 PM

Sunday: 10:00 AM – 4:00 PM

+91 93911 67991

© 2026 IJSREM – International Journal of Scientific Research in Engineering and Management. This is an open-access journal. Articles are published under the Creative Commons Attribution (CC BY 4.0) License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

DisclaimerPrivacy PolicyTerms and Conditions
ArticlePeer ReviewedOpen AccessPlagiarism Passed
Paper ID:IJSREM69263

CONSTRUCTION SCHEDULING AND RESOURCE MANAGEMENT: A REVIEW OF MANUAL PLANNING, MICROSOFT PROJECT AND RESOURCE OPTIMIZATION

Stream/Area:

-

Subject:

-

Paper ID:

IJSREM69263

Volume:

10 |

11 |

Nov 2026

Pages:

1-9

Publication Frequency:

Monthly (12 issues per year)

DOI
Digital Object Identifier
10.55041/IJSREM69263

License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.

Share this article:

Authors

Meet V. Rathi

Meet V. Rathi

Construction management and engineering

Birla Vishvakarma Mahavidyalaya

Download Author Certificate
EMVO

Er. Mehul V. Oza

Construction management and engineering

Birla Vishvakarma Mahavidyalaya

Download Co-Author Certificate
PDRLP

Prof. Dr. Reshma L. Patel

Construction management and engineering

Birla Vishvakarma Mahavidyalaya

Download Co-Author Certificate
PCR

Prof. Chintan Raichura

Construction management and engineering

Birla Vishvakarma Mahavidyalaya

Download Co-Author Certificate
PDJP

Prof. Dr. J.R. Pitroda

Construction management and engineering

Birla Vishvakarma Mahavidyalaya

Download Co-Author Certificate
DKBV

Dr. K. B. Vaghela

Construction management and engineering

Birla Vishvakarma Mahavidyalaya

Download Co-Author Certificate
JDP

Jayesh D. Prajapati

Construction management and engineering

Birla Vishvakarma Mahavidyalaya

Download Co-Author Certificate

Author Services & Downloads

Full ArticlesAcceptance Certificate

Abstract

Construction projects involve several interconnected activities, resources, and financial commitments that need to be carefully planned and coordinated to achieve the desired objectives within the time and budget. Traditionally, construction schedules have been developed using engineers' experience, bar charts, spreadsheets, and manual calculations. While these methods are suitable for relatively simple projects, managing complex activities, changing work sequences, and fluctuating resource requirements becomes increasingly difficult as project complexity increases. The current research evaluates approaches to preparing construction schedules and managing resources, with special emphasis on conventional planning practices, use of Microsoft Project and resource allocation optimization. The body of literature covers scheduling techniques in residential and commercial construction, activity scheduling, resource allocation and leveling, time and cost estimating, use of project management tools as well as the use of artificial intelligence. Research shows that scheduling is not only about defining the times of beginning and completing tasks, but also about having enough resources (materials, workforce and machinery) to have a seamless work. The article also discusses the use of Microsoft Project for scheduling, linking activities, identifying key stages, allocating resources and tracking the process. This research indicates that a systematic analysis should be done on both manual scheduling and planning via Microsoft Project using identical parameters. The aspects evaluated involve things like total construction time, project duration, critical path, resource usage, over-usage, and the cost of resources. In general, the study concludes that an efficient combination of computerized scheduling tools, correct project data, resource management and a good judgment of specialists is necessary for the success of construction scheduling.

KEYWORDS

Construction Scheduling Resource Management Manual Planning Microsoft Project Resource Allocation Resource Levelling Resource Optimization.

Cite This Article

Meet V. Rathi, Er. Mehul V. Oza, Prof. Dr. Reshma L. Patel, Prof. Chintan Raichura, Prof. Dr. J.R. Pitroda, Dr. K. B. Vaghela, Jayesh D. Prajapati, "CONSTRUCTION SCHEDULING AND RESOURCE MANAGEMENT: A REVIEW OF MANUAL PLANNING, MICROSOFT PROJECT AND RESOURCE OPTIMIZATION," International Journal of Scientific Research in Engineering and Management, vol. 10, no. 11, pp. 1-9, Nov 2026. https://doi.org/10.55041/IJSREM69263

Full Article/Conclusion

The review of the available literature on construction scheduling and resource management leads to the following important conclusions: 1.            Successful construction scheduling is very crucial to the accomplishment of the projects in accordance with the established time and cost parameters. The approved schedule should list construction activities, the number of days necessary for their completion, as well as logical connections and order of these operations. 2.            Construction scheduling is interrelated with resource management. Labor, materials, and tools should be synchronized with planned tasks to prevent delays, resource waste, and extra costs. 3.            Research carried out by Maruthi and others and by Subramani and Karthick prove the significance of resource allocation and resource leveling in achieving the equilibrium of resource needs. 4.            Research by Kamire et al., Yadav et al. and Al-Dhamad et al. shows effectiveness of Microsoft Project in construction scheduling, resource allocation, Gantt chart preparation, recognition of critical path and cost analysis. All these studies prove that electronic scheduling tools help in implementation of effective project planning and monitoring [4], [9], [10]. 5.            The literature review indicates that effectiveness of project management software depends on project requirements, assessment criteria, user knowledge and the correctness of the input data. No software for project management can be considered the best solution in any construction project. 6.            Successful implementation of construction project depends not only on scheduling methods, but also on the possibility of effective communication among stakeholders, distribution of duties, time of procurement and site conditions. Practical experience and professional judgement are important for successful construction management. 7.            The research studies reviewed offer a basis for assessing differences between manual scheduling and Microsoft Project scheduling in relation to the same project scope, activity characteristics, resource requirements, productivity assumptions, and work conditions. 8.            All things considered, the suggested comparative study can compare the two approaches based on such parameters as time of schedule production, duration of the project, relationships between activities, critical path, resource demand, resource over-allocation, resource utilization, and resource costs. The research outcomes may reveal advantages and disadvantages of both methods.

References

1.            Maruthi, J. R. Patil, and R. S. Agawane, “Optimization for Fluctuation in Resource Demands in Construction Projects,” International Research Journal of Engineering and Technology (IRJET), vol. 2, no. 3, Jun. 2015, pp. 1289–1296. Available: https://www.irjet.net/archives/V2/i3/Irjet-v2i3194.pdf 2.            T. Subramani and T. M. Karthick, “Study on Time and Resource Management in Construction Projects Using MS Project,” International Journal of Engineering & Technology, vol. 7, no. 3.10, 2018, pp. 23–26, doi: 10.14419/ijet.v7i3.10.15622. 3.            K. Phophalia and R. Basu, “Evaluation of Microsoft Project and Primavera P6 as Construction Project Management Software in India,” International Journal of Innovations in Engineering Research and Technology, vol. 5, no. 3, Mar. 2018. 4.            V. Kamire, P. S. Jawale, and V. Iyer, “Scheduling of Residential Building Using MS Project,” Journal of Emerging Technologies and Innovative Research, vol. 9, no. 10, Oct. 2022. 5.            P. G. Gunaga and G. George, “Planning, Scheduling and Cost Estimation of Villa Project Using Microsoft Project,” International Journal for Research in Applied Science & Engineering Technology, vol. 10, no. 9, 2022, doi: 10.22214/ijraset.2022.46885. 6.            H. Thota et al., “Resource Allocation, Scheduling and Planning of a Multi Storeyed Residential Building,” E3S Web of Conferences, vol. 391, 2023, Art. no. 01217, doi: 10.1051/e3sconf/202339101217. 7.            S. Aguda, “Scheduling and Resource Management in Sustainable Construction Projects,” European Journal of Business and Management, vol. 16, no. 9, 2024, doi: 10.7176/EJBM/16-9-12. 8.            M. Oyier and J. Tumuti, “Project Management and Performance of Residential Construction Projects in Nairobi City County, Kenya,” Journal of Entrepreneurship & Project Management, vol. 5, no. 1, 2025, pp. 19–28. 9.            B. K. Yadav, P. Kumar, and Azharuddin, “Utilizing Microsoft Project for Resource Planning and Optimization in Mid-Rise Residential Construction in Udaipur,” International Journal for Research in Applied Science & Engineering Technology, vol. 13, no. 6, Jun. 2025, pp. 3148–3156, doi: 10.22214/ijraset.2025.72825. 10.        S. H. R. Al-Dhamad, S. I. B. Kurwi, I. F. Varouqa, G. Hayder, A. H. Obaid, and F. M. S. Al-Zwainy, “Optimizing Project Management: Planning, Scheduling, and Cost Estimation Using Microsoft Project,” Journal of Applied Science, Engineering, Technology, and Education, vol. 7, no. 2, 2025, pp. 349–356, doi: 10.35877/454RI.asci4165.

Editorial & Review Transparency

Publication Date

11/20/2026

Peer Review Type

Double-Blind Peer Review

Review Rounds: 2

Documents

Review Report (Confidential)
Copyright Form (Office)

Article Metrics & Impact

Article Views

0

Total views since publication

PDF Downloads

1

Total downloads since publication

Geographic Reach

5

Indexing, Archiving & Preservation

Google Scholar
Academia
ResearchGate
Crossref
SSRN
Semantic Scholar
Thomson Reuters
WorldCat
Mendeley
OpenAlex
EBSCO
Zenodo

Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.

Ethics, Compliance & Transparency

Plagiarism Screening

This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.

Conflict of Interest

The authors declare no conflict of interest related to this research work.

Funding Information

No funding information available for this research.

Similar & Recommended Articles

Similar Articles by Topic

Related research in the same subject area

Loading similar articles...