Loading article...
Loading article...
Stream/Area:
-
Subject:
-
Paper ID:
IJSREM61946
Volume:
10 |
4 |
April 2026
Pages:
1--
Publication Frequency:
Monthly (12 issues per year)
License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.
Department of Civil Engineering
BVM Engineering College, Vallabh Vidyanagar – Gujarat – India.
Department of Civil Engineering
BVM Engineering College, Vallabh Vidyanagar – Gujarat – India.
Department of Civil Engineering
BVM Engineering College, Vallabh Vidyanagar – Gujarat – India.
Department of Civil Engineering
BVM Engineering College, Vallabh Vidyanagar – Gujarat – India.
Cost overrun is one of the major challenges in construction projects because it affects budget, project duration, quality, and stakeholder satisfaction. This study identified its main causes, effects, and solutions through a questionnaire survey of construction professionals, and the responses were analyzed using Mean Score and Relative Importance Index (RII). The findings showed that inflation and rising material prices are the leading causes, while poor planning, weak monitoring, delayed decisions, improper site investigation, and poor material management were also found responsible. It was observed that cost overrun causes delays, financial losses, reduced quality, and lower client satisfaction. Better planning, accurate estimation, regular monitoring, and effective coordination can be adopted to control cost overrun and improve project performance.
KEYWORDS
1. The study clearly shows that cost overrun is not caused by a single issue, but by a combination of financial, managerial, and technical factors working together throughout the project lifecycle. 2. Among all the factors, inflation and price escalation stand out as the most influential, indicating how strongly external economic conditions can impact construction project costs. 3. It is also evident that project management practices play a crucial role, as issues like weak monitoring and slow decision-making directly lead to inefficiencies and increased costs. 4. Technical shortcomings, especially poor site investigation and improper material planning, further add to the problem by causing rework, delays, and wastage of resources. 5. The impact of cost overrun goes beyond just budget increase; it affects project timelines, reduces construction quality, and weakens client trust and satisfaction. 6. The findings suggest that better planning at the initial stage, along with realistic cost estimation, can significantly reduce the chances of cost overrun. 7. Continuous monitoring, proper coordination among stakeholders, and timely decisions during execution are equally important to keep the project on track. 8. Controlling cost overrun requires a balanced approach that combines strong financial control with effective project management and practical site-level planning.
[1] D. Arditi, G. T. Akan, and S. Gurdamar, “Cost overruns in public projects,” Int. J. Proj. Manag., vol. 3, no. 4, pp. 218–224, 1985, doi: 10.1016/0263-7863(85)90053-5. [2] M. K. Soundarya et al., “An investigation study on residential buildings for cost overrun,” Sci. Rep., vol. 15, no. 1, pp. 1–11, 2025, doi: 10.1038/s41598-025-95984-x. [3] A. Kavuma, J. Ock, and H. Jang, “Factors influencing Time and Cost Overruns on Freeform Construction Projects,” KSCE J. Civ. Eng., vol. 23, no. 4, pp. 1442–1450, 2019, doi: 10.1007/s12205-019-0447-x. [4] J. Eliasson, “Cost overruns of infrastructure projects – distributions, causes and remedies,” Transp. Res. Part A Policy Pract., vol. 198, no. May, p. 104532, 2025, doi: 10.1016/j.tra.2025.104532. [5] P. E. D. Love, X. Wang, C. Sing, and R. L. K. Tiong, “Determining the Probability of Project Cost Overruns,” J. Constr. Eng. Manag., vol. 139, no. 3, pp. 321–330, 2013, doi: 10.1061/(asce)co.1943-7862.0000575. [6] S. P. Wanjari and G. Dobariya, “Identifying factors causing cost overrun of the construction projects in India,” Sadhana - Acad. Proc. Eng. Sci., vol. 41, no. 6, pp. 679– 693, 2016, doi: 10.1007/s12046-016-0498-3. [7] A. M. Belay and O. Torp, “Construction cost performance under quality-gated framework: the cases of Norwegian road constructions,” Int. J. Constr. Manag., vol. 23, no. 6, pp. 1030–1043, 2023, doi: 10.1080/15623599.2021.1949670. [8] N. Adepu, S. Kermanshachi, A. Pamidimukkala, and K. Loganathan, “Evaluation of Cost Overrun in Construction Projects during COVID-19 Pandemic,” J. Leg. Aff. Disput. Resolut. Eng. Constr., vol. 16, no. 1, pp. 1–10, 2024, doi: 10.1061/jladah.ladr-1080. [9] P. E. D. Love, C.-P. Sing, B. Carey, and J. T. Kim, “Estimating Construction Contingency: Accommodating the Potential for Cost Overruns in Road Construction Projects,” J. Infrastruct. Syst., vol. 21, no. 2, pp. 1–10, 2015, doi: 10.1061/(asce)is.1943- 555x.0000221. [10] I. Youssefi and T. Celik, “Optimized Approach toward Identification of Influential Cost Overrun Causes in Construction Industry,” ASCE-ASME J. Risk Uncertain. Eng. Syst. Part A Civ. Eng., vol. 9, no. 2, 2023, doi: 10.1061/ajrua6.rueng-982. [11] C. B. Venkateswaran and R. Murugasan, “Time delay and cost overrun of road over bridge (ROB) construction projects in India,” J. Constr. Dev. Ctries., vol. 22, no. November, pp. 79–96, 2017, doi: 10.21315/jcdc2017.22.supp1.5. [12] T. A. Rajan, G. Gopinath, and M. Behera, “PPPs and Project Overruns: Evidence from Road Projects in India,” J. Constr. Eng. Manag., vol. 140, no. 5, pp. 1–10, 2014, doi: 10.1061/(asce)co.1943-7862.0000797. [13] M. L. Kansal and S. S. Agarwal, “Uncertainties-Based Potential Time and Cost Overrun Assessment While Planning a Hydropower Project,” ASCE-ASME J. Risk Uncertain. Eng. Syst. Part A Civ. Eng., vol. 8, no. 4, pp. 1–14, 2022, doi: 10.1061/ajrua6.0001270. [14] G. D. Creedy, M. Skitmore, and J. K. W. Wong, “Evaluation of Risk Factors Leading to Cost Overrun in Delivery of Highway Construction Projects,” J. Constr. Eng. Manag., vol. 136, no. 5, pp. 528–537, 2010, doi: 10.1061/(asce)co.1943-7862.0000160. [15] H. Doloi, “Cost Overruns and Failure in Project Management: Understanding the Roles of Key Stakeholders in Construction Projects,” J. Constr. Eng. Manag., vol. 139, no. 3, pp. 267–279, 2013, doi: 10.1061/(asce)co.1943-7862.0000621. [16] M. Tayyab, M. Furkhan, M. Rizwan, M. Jameel, and A. Chadee, “A Study on Factors Influencing Cost Overrun in High-rise Building Construction across India,” Journal of Smart Buildings and Construction Technology, vol. 5, no. 1, pp. 52–83, 2023, doi: 10.30564/jsbct.v5i1.5489. [17] A. Senouci, A. Ismail, and N. Eldin, “Time Delay and Cost Overrun in Qatari Public Construction Projects,” Procedia Eng., vol. 164, no. June, pp. 368–375, 2016, doi: 10.1016/j.proeng.2016.11.632. [18] F. Zhu, H. Hu, F. Xu, and N. Tang, “Predicting the Impact of Country-Related Risks on Cost Overrun for Overseas Infrastructure Projects,” J. Constr. Eng. Manag., vol. 147, no. 2, 2021, doi: 10.1061/(asce)co.1943-7862.0001959. [19] C. D. Annamalaisami and A. Kuppuswamy, “Managing Cost Risks: Toward a Taxonomy of Cost Overrun Factors in Building Construction Projects,” ASCE-ASME J. Risk Uncertain. Eng. Syst. Part A Civ. Eng., vol. 7, no. 2, 2021, doi: 10.1061/ajrua6.0001132. [20] Y. Rosenfeld, “Root-Cause Analysis of Construction-Cost Overruns,” J. Constr. Eng. Manag., vol. 140, no. 1, 2014, doi: 10.1061/(asce)co.1943-7862.0000789. [21] M. Ma, V. W. Y. Tam, K. N. Le, and R. Osei-Kyei, “A systematic literature review on price forecasting models in construction industry,” Int. J. Constr. Manag., vol. 24, no. 11, pp. 1191–1200, 2024, doi: 10.1080/15623599.2023.2241761.
Publication Date
4/30/2026
Peer Review Type
Double-Blind Peer Review
Review Rounds: 2
Documents
Article Views
1
Total views since publication
PDF Downloads
4
Total downloads since publication
Geographic Reach
5
Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.
Plagiarism Screening
This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.
Conflict of Interest
The authors declare no conflict of interest related to this research work.
Funding Information
No funding information available for this research.
Related research in the same subject area
Loading similar articles...