Crossref DOIMemberCiteFactoropen accessissn
SJIF Impact Factor 8.659 | ISSN: 2582-3930
IJSREM Logo

International Journal of Scientific Research in Engineering and Management

(Gateway to Global Scholars - An International, Scholarly, Multi-Disciplinary, Open Access Journal)

Peer-Reviewed Journal Designed to Meet UGC's Quality Parameters

HomeCurrent IssuePast IssuesPay OnlineConferencesEditorial BoardAbout UsContact Us
IJSREM

Loading article...

Follow Us

  • Google Scholar
  • ResearchGate
  • Academia.edu
  • Mendeley
  • LinkedIn
  • Facebook
  • Instagram

Journal Policies

  • Peer Review Policy
  • Publication Ethics
  • Copyright Infringement
  • Refund & Cancellation Policy
  • Terms and Conditions
  • Privacy Policy

Journal Identifiers & Licenses

  • ISSN Verified: 2582-3930ISSN Verified: 2582-3930
  • Crossref DOI: 10.55041Crossref DOI: 10.55041
  • SJIF Ranking: 08.659SJIF Ranking: 08.659
  • Licensed under CC BY 4.0Licensed under CC BY 4.0
  • ISO Certification: 9001:2015ISO Certification: 9001:2015
  • Indexed & Cited In: Google ScholarIndexed & Cited In: Google Scholar

Contact Us

International Journal of Scientific Research in Engineering and Management (IJSREM)

#62/1, New No 7, 1st Cross, 2nd Main, Ganganagar, R T Nagar, Bangalore North, Bangalore, Karnataka, India – 560032
[email protected]+91 93911 67991
logos
logos
Working Hours

Mon – Sat: 9:00 AM – 6:00 PM

Sunday: 10:00 AM – 4:00 PM

+91 93911 67991

© 2026 IJSREM – International Journal of Scientific Research in Engineering and Management. This is an open-access journal. Articles are published under the Creative Commons Attribution (CC BY 4.0) License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

DisclaimerPrivacy PolicyTerms and Conditions
ArticlePeer ReviewedOpen AccessPlagiarism Passed
Paper ID:10.55041/IJSREM16119

CRITICAL CHAIN PROJECT MANAGEMENT IN CONSTRUCTION PROJECT

Stream/Area:

-

Subject:

-

Paper ID:

10.55041/IJSREM16119

Volume:

6 |

8 |

Aug 2022

Pages:

Publication Frequency:

Monthly (12 issues per year)

DOI
Digital Object Identifier
10.55041/IJSREM16119

License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.

Share this article:

Authors

DS

Deepak Sharma

MR

Masoom Reza

Author Services & Downloads

Full Articles

Abstract

Modern Construction industry has achieved broad development overall especially in couple of years. Construction is the second biggest monetary movement in India after agribusiness. Poor Planning in Construction Projects results in delay in completion and financial losses. Developed Countries have adopted Significant planning measures and technique to minimize or eliminate delays at construction projects. Lack of foresight in Construction Projects brings about defer in finish and monetary misfortunes. Countries have embraced Significant arranging measures and method to limit or take out delays at development projects. A real preparation and assets coordination between clients and labour force is expected to finish the undertaking in time period, which is a lot of ailing in Indian Construction projects. “Eliyahu M.Goldratt applied Theory of constraints (TOC) in project management and the outcome was a robust scheduling technique called critical chain project management (CCPM).” A detailed study was completed to figure out the reasons for delays and limit it with the Critical Chain Project Management techniques with preventive measures.

KEYWORDS

Buffers Critical Chain Project Management Construction Theory of Constraints

Cite This Article

Deepak Sharma, Masoom Reza, "CRITICAL CHAIN PROJECT MANAGEMENT IN CONSTRUCTION PROJECT," International Journal of Scientific Research in Engineering and Management, vol. 6, no. 8, Aug 2022. https://doi.org/10.55041/IJSREM16119

Full Article/Conclusion

References

Editorial & Review Transparency

Publication Date

8/18/2022

Peer Review Type

Double-Blind Peer Review

Review Rounds: 2

Documents

Review Report (Confidential)
Copyright Form (Office)

Article Metrics & Impact

Article Views

0

Total views since publication

PDF Downloads

2

Total downloads since publication

Geographic Reach

5

Indexing, Archiving & Preservation

Google Scholar
Academia
ResearchGate
Crossref
SSRN
Semantic Scholar
Thomson Reuters
WorldCat
Mendeley
OpenAlex
EBSCO
Zenodo

Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.

Ethics, Compliance & Transparency

Plagiarism Screening

This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.

Conflict of Interest

The authors declare no conflict of interest related to this research work.

Funding Information

No funding information available for this research.

Similar & Recommended Articles

Similar Articles by Topic

Related research in the same subject area

Loading similar articles...