Crossref DOIMemberCiteFactoropen accessissn
SJIF Impact Factor 8.659 | ISSN: 2582-3930
IJSREM Logo

International Journal of Scientific Research in Engineering and Management

(Gateway to Global Scholars - An International, Scholarly, Multi-Disciplinary, Open Access Journal)

Peer-Reviewed Journal Designed to Meet UGC's Quality Parameters

HomeCurrent IssuePast IssuesPay OnlineConferencesEditorial BoardAbout UsContact Us
IJSREM

Loading article...

Follow Us

  • Google Scholar
  • ResearchGate
  • Academia.edu
  • Mendeley
  • LinkedIn
  • Facebook
  • Instagram

Journal Policies

  • Peer Review Policy
  • Publication Ethics
  • Copyright Infringement
  • Refund & Cancellation Policy
  • Terms and Conditions
  • Privacy Policy

Journal Identifiers & Licenses

  • ISSN Verified: 2582-3930ISSN Verified: 2582-3930
  • Crossref DOI: 10.55041Crossref DOI: 10.55041
  • SJIF Ranking: 08.659SJIF Ranking: 08.659
  • Licensed under CC BY 4.0Licensed under CC BY 4.0
  • ISO Certification: 9001:2015ISO Certification: 9001:2015
  • Indexed & Cited In: Google ScholarIndexed & Cited In: Google Scholar

Contact Us

International Journal of Scientific Research in Engineering and Management (IJSREM)

#62/1, New No 7, 1st Cross, 2nd Main, Ganganagar, R T Nagar, Bangalore North, Bangalore, Karnataka, India – 560032
[email protected]+91 93911 67991
logos
logos
Working Hours

Mon – Sat: 9:00 AM – 6:00 PM

Sunday: 10:00 AM – 4:00 PM

+91 93911 67991

© 2026 IJSREM – International Journal of Scientific Research in Engineering and Management. This is an open-access journal. Articles are published under the Creative Commons Attribution (CC BY 4.0) License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

DisclaimerPrivacy PolicyTerms and Conditions
ArticlePeer ReviewedOpen AccessPlagiarism Passed
Paper ID:IJSREM69106

Critical Success Factors and Challenges of Project Management Consultants in Construction Projects: A Review

Stream/Area:

-

Subject:

-

Paper ID:

IJSREM69106

Volume:

10 |

11 |

Nov 2026

Pages:

1-9

Publication Frequency:

Monthly (12 issues per year)

DOI
Digital Object Identifier
10.55041/IJSREM69106

License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.

Share this article:

Authors

Nayan Harji Kerai

Nayan Harji Kerai

Construction Engineering and Management

Birla Vishvakarma Mahavidyalaya Engineering College

Download Author Certificate
PDJRP

Prof. Dr. J. R. Pitroda

Civil Engineering Department

Birla Vishvakarma Mahavidyalaya Engineering College

Download Co-Author Certificate
PDRLP

Prof. Dr. Reshma L. Patel

Civil Engineering Department

Birla Vishvakarma Mahavidyalaya Engineering College

Download Co-Author Certificate
Er. Bharatkumar Kara

Er. Bharatkumar Kara

Civil Engineering Department

Estim Construction Zambia

Download Co-Author Certificate
ECP

Er. Charudatt Patel

Civil Engineering Department

A&G Bilders

Download Co-Author Certificate

Author Services & Downloads

Full ArticlesAcceptance Certificate

Abstract

PMC is being engaged for project planning, co-ordination, control and supervision of construction work. PMC also helps to ensure transparency in communication between the client, contractor, consultant and authorities concerned. PMC influences the project execution to a great extent in order to ensure that the project gets completed within the predetermined timeframe, budget, scope and quality and also to accomplish the project success objective. The present study is an attempt to comprehend the important CSFs (Critical Success Factors) as well as the challenges faced by the PMC's in construction project management. For identifying the CSFs various research papers on PMC, Construction delays, Cost Factors, Service quality, Project management maturity, Stakeholder management, Risk management, Building information modelling (BIM) were studied. This review revealed the main CSFs and issues which need to be examined in the next research study. A questionnaire survey would be carried out online for collecting the views of the construction professionals in the cities of Gujarat and Lusaka. The obtained data will be examined using statistical and ranking methods for identifying the most influential CSFs and Challenges and to further analyze their influence on project performance. The research outcome can suggest some measures to assist the PMCs in enhancing the project performance.

KEYWORDS

Project Management Consultant Critical Success Factors Construction Projects PMC Performance Project Challenges Project Performance Stakeholder Management.

Cite This Article

Nayan Harji Kerai, Prof. Dr. J. R. Pitroda, Prof. Dr. Reshma L. Patel, Er. Bharatkumar Kara, Er. Charudatt Patel, "Critical Success Factors and Challenges of Project Management Consultants in Construction Projects: A Review," International Journal of Scientific Research in Engineering and Management, vol. 10, no. 11, pp. 1-9, Nov 2026. https://doi.org/10.55041/IJSREM69106

Full Article/Conclusion

      The following are the findings on Critical Success Factors and Challenges of PMC in Construction Projects are as under: 1.                PMC performance is dependent on planning, coordination, monitoring and supervision in the construction projects. 2.                PMC performance is governed by planning, communication, coordination, stakeholder management and monitoring in the construction projects. 3.                Major challenges faced by PMC are time delay, cost overrun, resource shortages, change in designs and coordination. 4.                Recent research papers focus on risk management, stakeholder management, use of technology and systematic project management. 5.                The literature indicates a need to study CSFs and PMC challenges together in relation to time, cost, and quality. 6.                The next phase will use a structured survey in Gujarat (India) and Lusaka (Zambia) to identify and prioritize key factors and develop practical improvement measures.

References

[1]        S. Manoj Raut, “Role of Project Management Consultant to coordinate between clients and contractor,” Organization, Technology and Management in Construction: An International Journal, vol. 3, no. 2, 2011, doi: 10.5592/otmcj.2011.2.8. [2]        S. K. Gupta, “Role of a project management consultant (PMC),” in 16th NCB International Seminar on Cement, Concrete and Building Materials, 2019. [3]        Ade Asmi, “Project Delay Factor Ranking among Contractor , Client and Project Management Consultant in Construction Industry,” Widyakala Journal, vol. 8, no. 2, pp. 48–53, 2021. [4]        Dzulkarnaen Ismail , Ir Dr. Rosli Mohamad Zin, “Services Provided by Project Management Consultant in Malaysian Construction Industry,” in Services Provided By Project Management Consultant in Malaysian Construction Industry. International Conference In The Built Environment In The 21st Century (ICIBE 2006), 2006, pp. 267–276. doi: 10.5040/9798400668883.0003. [5]        Tran Thanh Ha, Long Le Hoai, “A Fuzzy AHP Model for Selection of Consultant Contractor in Bidding Phase in Vietnam,” KICEM Journal of Construction Engineering and Project Management, vol. 5, no. 2, pp. 35–43, 2015, doi: 10.6106/jcepm.2015.5.2.035. [6]        A. R. Nikumbh and S. S. Pimplikar, “Role , Services of Project Management Consultancy in Construction Projects & the Audit Process,” Journal of Mechanical and Civil Engineering (IOSR-JMCE), vol. 11, no. 3, pp. 22–31, 2014. [7]        C. K. I. Ibrahim, S. B. Costello, and S. Wilkinson, “Key relationship oriented indicators of team integration in construction projects,” International Journal of Innovation, Management and Technology, vol. 2, no. 6, pp. 441–446, 2011, [Online]. Available: http://www.ijimt.org/papers/173-A10025.pdf [8]        A. R. Nikumbh and S. S. Pimplikar, “Role of Project Management Consultancy in Construction Project,” Journal of Mechanical and Civil Engineering (IOSR-JMCE), vol. 10, no. 6, pp. 14–19, 2014. [9]        Julio Zulu, “Examining Effectiveness of Risk Management Processes in Project Management: A Case Study of Lusaka Phase III Road Expansion Projects,” JENER Journal of Empirical and Non-Empirical Research, vol. 2, no. 1, pp. 376–388, 2026, doi: 10.38124/ijisrt/26jan635. [10]      D. Phiri and K. Chimbomba, “An Analysis of Stakeholder Management in Project Performance: A Case of Lusaka 400 Road Construction Projects,” Journal of Arts, Humanities and Social Science (JAHSS), vol. 2, no. 1, pp. 50–61, 2025, doi: 10.69739/jahss.v2i1.305.

Editorial & Review Transparency

Publication Date

11/17/2026

Peer Review Type

Double-Blind Peer Review

Review Rounds: 2

Documents

Review Report (Confidential)
Copyright Form (Office)

Article Metrics & Impact

Article Views

0

Total views since publication

PDF Downloads

0

Total downloads since publication

Geographic Reach

5

Indexing, Archiving & Preservation

Google Scholar
Academia
ResearchGate
Crossref
SSRN
Semantic Scholar
Thomson Reuters
WorldCat
Mendeley
OpenAlex
EBSCO
Zenodo

Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.

Ethics, Compliance & Transparency

Plagiarism Screening

This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.

Conflict of Interest

The authors declare no conflict of interest related to this research work.

Funding Information

No funding information available for this research.

Similar & Recommended Articles

Similar Articles by Topic

Related research in the same subject area

Loading similar articles...