Loading article...
Loading article...
Stream/Area:
-
Subject:
-
Paper ID:
10.55041/IJSREM21303
Volume:
7 |
5 |
May 2023
Pages:
Publication Frequency:
Monthly (12 issues per year)
License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.
Our project is to enable the worker to have the ability to move around with absolute ease, with the use of a chairless chair. Ø Person with the problem of Arthiritis (bone problem) can get a little relieve with this instrument. Ø Old people who have to travel in crowded places like mumbai can make good use of this 21st century instrument. Ø It can also help our back remain straight and can reduce the occurrence of bad postures which can result in muscle related injuries . v Project Objectives :- The objective of our project is to develop affordable, wearable, light weight, user friendly chairless chair which can enable the worker, back pain, arthritis patients to have the ability to move around with absolute ease, with the use of a chairless chair. v Introduction :- Today the world is now going to be compact. For suitability to the world, things are also going to be made of compact and smaller in size. Now the battle is also done between machines instead of man to man. Machine, which is fighting, are operated and driven by man sitting instead the vehicle or being in touch with the machines. Also the human has to win the war against the increasing oil prizes and tremendously increasing pollution level in the air. To win this war and to thought regarding another parallel motive force to the auto-mobile, we have thought of manufacturing “(CHAIRLESS CHAIR)” through the mission of project. Project is a mission of creating something new, which is innovative i.e. manufacturing of a new product. The prime requirements of an effective project organization therefore are: 1) Flexibility 2) Autonomy 3) Group functional integration 4) Small group size 5) Common work location for all project members 6) Team spirit among group members All the foregoing requirements are mutually reinforcing, and conjoin together towards effective implementation of risky and time-bound project.
KEYWORDS
Publication Date
5/18/2023
Peer Review Type
Double-Blind Peer Review
Review Rounds: 2
Documents
Article Views
0
Total views since publication
PDF Downloads
1
Total downloads since publication
Geographic Reach
5
Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.
Plagiarism Screening
This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.
Conflict of Interest
The authors declare no conflict of interest related to this research work.
Funding Information
No funding information available for this research.
Related research in the same subject area
Loading similar articles...