Loading article...
Loading article...
Stream/Area:
-
Subject:
-
Paper ID:
IJSREM68759
Volume:
10 |
11 |
Nov 2026
Pages:
1-11
Publication Frequency:
Monthly (12 issues per year)
License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.

Civil Engineering
Birla Vishvakarma Mahavidyalaya
Civil Engineering
Birla Vishvakarma Mahavidyalaya
Civil Engineering
PSP Projects Limited PSP House, Ahmedabad
Civil Engineering
Birla Vishvakarma Mahavidyalaya
Building Information Modelling (BIM) has become more commonly used in the planning and coordination processes of construction projects. It provides an opportunity to create and analyse multi-disciplinary information within one environment. The 3D model is key to this process. By integrating models from architectural, structural and building services, coordination problems can be identified before starting on site. This review discusses how 3D BIM is used in planning on construction projects, looking at integration of 3D models, identification and resolution of clashes, integration of schedules and 4D BIM. Applications, advantages, issues when implementing and recent trends have been assessed. An integrated model is always produced therefore improving visualisation and inter-disciplinary communication. Clash detection improves identifying spatial clashes and prioritising them ensures the most important clashes are resolved first. However, increased time is required to link the coordinated model to the construction schedule allowing the processes to be viewed in 4D. Several issues reduce the effectiveness of these processes. Interoperability issues, data inconsistency, user knowledge, poor inter-disciplinary coordination and the large number of clashes can all be an issue. Recent studies have moved away from simple clash detection to intelligent coordination and greater integration between models and schedules. Overall, this paper has developed a framework to link 3D BIM modelling, inter-disciplinary coordination, clash management, construction planning, 4D BIM and project performance. Areas which can be improved and further researched have been identified.
KEYWORDS
The following findings are derived from the reviewed literature and the case study: 1. A 3D BIM model provides structure to the data and elements within a project. 2. By incorporating architectural, structural and building service models collaboration between disciplines can be improved. This enables clarification of how elements interact with each other. 3. Using BIM clash detection can identify any coordination issues at an early stage. This allows the project team to deal with any clashes without causing any issues at the construction stage. 4. Linking the BIM model to the construction programme will help with planning. Using 4D BIM will make it easier to understand what order and when elements are to be constructed. 5. As demonstrated within the case study, using modelling, integration, clash detection, scheduling and 4D simulation will produce an integrated BIM workflow. This can therefore help with planning the construction. 6. The successful use of BIM requires more than software tools alone accurate models, effective coordination, suitable interoperability, trained users, and appropriate implementation practices are also important for achieving its intended benefits.
1. A. Z. Sampaio, N. R. Gomes, A. M. Gomes, and A. Sanchez-Lite, “Multi-Project in an Integrated BIM Model: Clash Detection and Construction Planning,” Journal of Software Engineering and Applications, vol. 15, pp. 345–358, 2022, doi: 10.4236/jsea. 2022.1510020. 2. D. Solanki, C. S. Raichura, J. R. Pitroda, M. Macwan, and Y. Shah, “Integration of Revit to Microsoft Project for Construction Project Management: A Comparative Analysis of Scheduling and Resource Allocation,” Journal of Construction Engineering, Technology & Management, vol. 15, no. 3, pp. 13–41, 2025. 3. O. Doukari, B. Seck, and D. Greenwood, “The Creation of Construction Schedules in 4D BIM: A Comparison of Conventional and Automated Approaches,” Buildings, vol. 12, no. 8, Art. no. 1145, 2022, doi: 10.3390/buildings12081145. 4. I. P. A. Sanjaya, I. G. A. A. Putera, P. I. P. Wiraningsih, and N. Ferrer, “Clash Detection Analysis of RSIA Building Construction Using Autodesk Revit and Navisworks,” Jurnal Ilmiah Teknik Sipil, vol. 29, pp. 88–96, 2025. 5. G. A. Pambudi and F. H. Suprahman, “Systematic Literature Review: Peranan Metode BIM dalam Integrated Project Delivery (IPD) untuk Mengoptimalkan Konstruktabilitas Proyek,” Jurnal Teoretis dan Terapan Bidang Rekayasa Sipil, vol. 32, no. 1, pp. 89–98, 2025, doi: 10.5614/jts.2025.32.1.10. 6. Z. Wu, K. Deng, C. Chen, H. Li, M. F. Antwi-Afari, and Y. Wang, “Status Quo and Future Trends of BIM-Based Coordination Research: A Critical Review,” Journal of Civil Engineering and Management, vol. 28, no. 6, pp. 469–484, 2022, doi: 10.3846/jcem.2022.16928. 7. E. J. M. Lins, R. P. Palha, M. d. C. M. Sobral, A. G. d. Araújo, and É. A. T. Marques, “Application of Building Information Modelling in Construction and Demolition Waste Management: Systematic Review and Future Trends Supported by a Conceptual Framework,” Sustainability, vol. 16, no. 21, Art. no. 9425, 2024, doi: 10.3390/su16219425. 8. Y. Cao, H. Su, S. N. Kamaruzzaman, N. M. Aziz, Q. Ma, and W. Cao, “BIM for Sustainable Urban Construction: A Systematic Review of Capability Assessment and Implementation with Implications for China,” Sustainability, vol. 18, Art. no. 6692, 2026, doi: 10.3390/su18136692. 9. B. C. Olaiya, O. G. Fadugba, and M. M. Lawan, “Building Information Modeling (BIM) Implementation and Practices in Construction Industry: A Review,” Advances in Civil Engineering Sustainable Materials and Resilient Structures, 2024, doi: 10.5772/intechopen.1006363. 10. A. Z. Sampaio, N. Gomes, and A. Gomes, “BIM Design Coordination: Conflict Analysis and Construction Simulation,” Procedia Computer Science, vol. 239, pp. 49–57, 2024, doi: 10.1016/j.procs.2024.06.145.
Publication Date
11/5/2026
Peer Review Type
Double-Blind Peer Review
Review Rounds: 2
Documents
Article Views
0
Total views since publication
PDF Downloads
8
Total downloads since publication
Geographic Reach
5
Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.
Plagiarism Screening
This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.
Conflict of Interest
The authors declare no conflict of interest related to this research work.
Funding Information
No funding information available for this research.
Related research in the same subject area
Loading similar articles...