Loading article...
Loading article...
Stream/Area:
-
Subject:
-
Paper ID:
IJSREM68796
Volume:
10 |
11 |
Nov 2026
Pages:
1-11
Publication Frequency:
Monthly (12 issues per year)
License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.
Civil Engineering
Pillai HOC College of Engineering and Technology, Rasayani
Department of Civil Engineering,
Pillai HOC College of Engineering and Technology, Rasayani, University of Mumbai, India
This study ranks twelve critical success factor categories for smart construction management in high-rise projects using the Relative Importance Index (RII). The analysis uses aggregate responses from 50 construction professionals to a 47-statement, five-point questionnaire. The overall reliability coefficient was 0.921. Leadership ranked first (RII = 0.868), followed by technology infrastructure and interoperability (0.864), communication and collaboration (0.860), skills and training (0.848), and safety and risk management (0.840). All twelve categories exceeded 0.780. The technology group averaged 0.856, compared with 0.812 for the organisational group and 0.784 for finance. Frequency-based calculations reproduced the three leading indices. Discrepancies between frequency-derived dispersion and aggregate standard deviations, together with gaps in the available statistical outputs, limit conclusions about stakeholder differences, factor structure and effects on project performance. The ranking identifies where project teams can focus implementation planning, including leadership accountability, interoperable information systems, staff training and safety planning.
KEYWORDS
This study prioritised twelve critical success factor categories for smart construction management using aggregate outputs for 50 professionals and a 47-statement instrument. Leadership ranked first at 0.868, followed by technology infrastructure at 0.864, communication at 0.860, training at 0.848 and safety at 0.840. Finance ranked twelfth at 0.784, indicating lower relative priority while retaining a mean above the neutral point. The selected technology grouping averaged 0.856, organisation averaged 0.812 and finance remained 0.784. The overall internal consistency coefficient was 0.921. The RII arithmetic and group averages are reproducible from the available summaries. However, the small differences between the leading categories, conflicting group definitions and inconsistent dispersion statistics limit stronger claims. Stakeholder differences, latent factor structure and causal project benefits remain unresolved. The practical contribution is a transparent ranking model that connects leadership accountability, interoperable information, training, communication and safety with project review. Future validation should retain individual responses, specify composite scoring and stakeholder codes, test rank stability and link implementation capability to independently measured cost, schedule, quality and safety outcomes.
1. M. Gunduz and M. Almuajebh, “Critical Success Factors for Sustainable Construction Project Management,” Sustainability, vol. 12, no. 5, Art. no. 1990, 2020, doi: 10.3390/su12051990. 2. A. F. Kineber, M. S. Uddin and A. F. Momena, “Exploring the Critical Success Factors of Value Management Implementation for Sustainable Residential Building Project: A Stationary Analysis Approach,” Sustainability, vol. 14, no. 23, Art. no. 16215, 2022, doi: 10.3390/su142316215. 3. S. D. Datta et al., “Critical project management success factors analysis for the construction industry of Bangladesh,” International Journal of Building Pathology and Adaptation, vol. 43, no. 3, pp. 482–511, 2025, doi: 10.1108/ijbpa-01-2022-0006. 4. A. H. Ali, A. F. Kineber, A. Elyamany, A. H. Ibrahim and A. O. Daoud, “Modelling the role of modular construction's critical success factors in the overall sustainable success of Egyptian housing projects,” Journal of Building Engineering, vol. 71, Art. no. 106467, 2023, doi: 10.1016/j.jobe.2023.106467. 5. A. M. Alawag, W. S. Alaloul, H. Mohamad, M. Liew, M. Awang and A. O. Baarimah, “Evaluating the role of critical success factors of Total quality management (TQM) implementation through SmartPLS in industrialized building projects (IBS),” Ain Shams Engineering Journal, vol. 16, no. 3, Art. no. 103294, 2025, doi: 10.1016/j.asej.2025.103294. 6. A. AlJaber, P. Martinez-Vazquez and C. Baniotopoulos, “Developing Critical Success Factors for Implementing Circular Economy in Building Construction Projects,” Buildings, vol. 14, no. 8, Art. no. 2319, 2024, doi: 10.3390/buildings14082319. 7. M. K. Buniya et al., “Critical Success Factors of Safety Program Implementation in Construction Projects in Iraq,” International Journal of Environmental Research and Public Health, vol. 18, no. 16, Art. no. 8469, 2021, doi: 10.3390/ijerph18168469. 8. Q. Chai, H. Li, W. Tian and Y. Zhang, “Critical Success Factors for Safety Program Implementation of Regeneration of Abandoned Industrial Building Projects in China: A Fuzzy DEMATEL Approach,” Sustainability, vol. 14, no. 3, Art. no. 1550, 2022, doi: 10.3390/su14031550. 9. A. Alghuried, “Assessing the critical success factors for the sustainable construction project management of Saudi Arabia,” Journal of Asian Architecture and Building Engineering, vol. 25, no. 1, pp. 598–616, 2026, doi: 10.1080/13467581.2025.2454616. 10. F. M. Ottaviani, G. Zenezini, F. Saba, A. De Marco and L. Gavinelli, “System-Level Critical Success Factors for BIM Implementation in Construction Management: An AHP Approach,” Systems, vol. 13, no. 2, Art. no. 94, 2025, doi: 10.3390/systems13020094.
Publication Date
11/6/2026
Peer Review Type
Double-Blind Peer Review
Review Rounds: 2
Documents
Article Views
0
Total views since publication
PDF Downloads
6
Total downloads since publication
Geographic Reach
5
Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.
Plagiarism Screening
This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.
Conflict of Interest
The authors declare no conflict of interest related to this research work.
Funding Information
No funding information available for this research.
Related research in the same subject area
Loading similar articles...