Crossref DOIMemberCiteFactoropen accessissn
SJIF Impact Factor 8.659 | ISSN: 2582-3930
IJSREM Logo

International Journal of Scientific Research in Engineering and Management

(Gateway to Global Scholars - An International, Scholarly, Multi-Disciplinary, Open Access Journal)

Peer-Reviewed Journal Designed to Meet UGC's Quality Parameters

HomeCurrent IssuePast IssuesPay OnlineConferencesEditorial BoardAbout UsContact Us
IJSREM

Loading article...

Follow Us

  • Google Scholar
  • ResearchGate
  • Academia.edu
  • Mendeley
  • LinkedIn
  • Facebook
  • Instagram

Journal Policies

  • Peer Review Policy
  • Publication Ethics
  • Copyright Infringement
  • Refund & Cancellation Policy
  • Terms and Conditions
  • Privacy Policy

Journal Identifiers & Licenses

  • ISSN Verified: 2582-3930ISSN Verified: 2582-3930
  • Crossref DOI: 10.55041Crossref DOI: 10.55041
  • SJIF Ranking: 08.659SJIF Ranking: 08.659
  • Licensed under CC BY 4.0Licensed under CC BY 4.0
  • ISO Certification: 9001:2015ISO Certification: 9001:2015
  • Indexed & Cited In: Google ScholarIndexed & Cited In: Google Scholar

Contact Us

International Journal of Scientific Research in Engineering and Management (IJSREM)

#62/1, New No 7, 1st Cross, 2nd Main, Ganganagar, R T Nagar, Bangalore North, Bangalore, Karnataka, India – 560032
[email protected]+91 93911 67991
logos
logos
Working Hours

Mon – Sat: 9:00 AM – 6:00 PM

Sunday: 10:00 AM – 4:00 PM

+91 93911 67991

© 2026 IJSREM – International Journal of Scientific Research in Engineering and Management. This is an open-access journal. Articles are published under the Creative Commons Attribution (CC BY 4.0) License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

DisclaimerPrivacy PolicyTerms and Conditions
ArticlePeer ReviewedOpen AccessPlagiarism Passed
Paper ID:IJSREM64475

Evaluation of Pillar Stability Across Different Extraction Depths Using FLAC3D Numerical Modeling: a case study on Kakatiya Khani No. 5 Incline located in the Godavari Valley Coalfield, Telangana

Stream/Area:

-

Subject:

-

Paper ID:

IJSREM64475

Volume:

10 |

6 |

Jun 2026

Pages:

1-24

Publication Frequency:

Monthly (12 issues per year)

DOI
Digital Object Identifier
10.55041/IJSREM64475

License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.

Share this article:

Authors

Venkateswarlu Kumba

Venkateswarlu Kumba

Geology

National Mineral Development Corporation

Download Author Certificate
BK

B.Praneeth Kumar

Mining

National Mineral Development Corporation

Download Co-Author Certificate

Author Services & Downloads

Full ArticlesAcceptance Certificate

Abstract

Coal pillar stability is one of the most critical factors governing the safety, productivity, and economic viability of underground coal mining operations employing the bord-and-pillar mining method. As mining activities progress to greater depths, the stress environment surrounding underground excavations becomes increasingly complex, resulting in higher pillar loading, stress concentration, and potential instability. The present study investigates the influence of extraction depth on coal pillar stability through three-dimensional numerical modeling using FLAC3D software. A detailed case study was conducted based on the geological and geotechnical conditions of Kakatiya Khani No. 5 Incline, operated by Singareni Collieries Company Limited (SCCL), Telangana, India. A three-dimensional numerical model representing the roof-pillar-floor system was developed using the Mohr–Coulomb constitutive model. Mine-specific geological parameters, material properties, pillar dimensions, and boundary conditions were incorporated into the simulation framework to replicate actual field conditions. Parametric analyses were performed for five different depths of working, namely 240 m, 280 m, 300 m, 330 m, and 360 m, while maintaining constant pillar geometry and gallery dimensions. The study evaluated stress distribution patterns, pillar strength characteristics, failure mechanisms, and factor of safety (FOS) values under varying overburden loading conditions. The simulation results revealed a significant increase in pillar stress with increasing depth of extraction. The average pillar stress increased from approximately 17.5 MPa at a depth of 240 m to about 21.1 MPa at 360 m depth. Stress concentration was predominantly observed along the pillar edges and corners, indicating these regions as the most vulnerable zones for failure initiation. Although pillar strength exhibited a marginal increase due to confinement effects, the rate of stress increase was substantially higher, resulting in a gradual reduction in the factor of safety with increasing depth. The numerical analysis further demonstrated that deeper workings are associated with higher risks of pillar instability, localized yielding, and potential roof control problems. Statistical evaluation of the simulation results established a strong positive correlation between extraction depth and induced pillar stress, confirming the significant influence of overburden loading on pillar performance. The findings emphasize the necessity of adopting depth-dependent pillar design methodologies rather than relying on conventional empirical approaches. The study demonstrates that FLAC3D-based numerical modeling provides a reliable and effective tool for evaluating pillar behavior, optimizing pillar dimensions, and improving mine safety in underground coal mines. The outcomes of this research contribute to the understanding of depth-related pillar behavior and provide valuable guidelines for mine planners, design engineers, and safety professionals in developing scientifically sound pillar design strategies for deep underground coal mining operations.

KEYWORDS

Coal Pillar Stability; Bord and Pillar Mining; FLAC3D; Numerical Modeling; Underground Coal Mining; Factor of Safety; Stress Distribution; Pillar Design; Geotechnical Engineering; Mine Safety; Extraction Depth; Rock Mechanics.

Cite This Article

Venkateswarlu Kumba, B.Praneeth Kumar, "Evaluation of Pillar Stability Across Different Extraction Depths Using FLAC3D Numerical Modeling: a case study on Kakatiya Khani No. 5 Incline located in the Godavari Valley Coalfield, Telangana," International Journal of Scientific Research in Engineering and Management, vol. 10, no. 6, pp. 1-24, Jun 2026. https://doi.org/10.55041/IJSREM64475

Full Article/Conclusion

The aim of the investigation was to evaluate the design of pillar in an underground coal mine. In this study the following conclusions have been made:   •          Regular Bord and pillar method of working was followed; Pillar was assumed to be of square shape. The gallery width and height of working did not change throughout Modelling. •          The numerical stress values of the pillar from the output in each case can be validated manually by the average stress formula •          Using DGMS specification for minimum pillar dimension for all approaches, safety factors were found to, at different depths and at particular width of opening. •          Simple linear equations were developed from graph and are analysed and taken into considerations.

References

[1] E. Hoek and J. W. Bray, Rock Slope Engineering, 3rd ed. London: Institution of Mining and Metallurgy, 1981. [2] B. H. G. Brady and E. T. Brown, Rock Mechanics for Underground Mining, 3rd ed. Dordrecht: Springer, 2006. [3] D. C. Wyllie and C. W. Mah, Rock Slope Engineering: Civil and Mining, 4th ed. Boca Raton, FL: CRC Press, 2004. [4] J. C. Jaeger, N. G. W. Cook, and R. W. Zimmerman, Fundamentals of Rock Mechanics, 4th ed. Oxford: Wiley-Blackwell, 2007. [5] A. Palmström and E. Broch, The Q-system for Rock Mass Classification in Tunnel Design, London: Taylor & Francis, 2006. [6] L. R. Alejano and A. M. Ferrero, “A brief review of some numerical models for rock slope stability analysis,” Geotech. Geol. Eng., vol. 23, no. 4, pp. 343–356, 2005. [7] T. N. Singh, A. Kainthola, and D. Verma, “Numerical modeling of bench slope stability using FLAC3D,” Int. J. Earth Sci. Eng., vol. 5, no. 3, pp. 528–533, 2012. [8] Q. Feng and Y. Liu, “Stability analysis of open-pit mine slope using FLAC3D,” in IOP Conf. Ser.: Earth Environ. Sci., vol. 170, p. 022046, 2018. [9] W. Hustrulid, M. K. McCarter, and D. Van Zyl, Open Pit Mine Planning and Design, Rotterdam: A.A. Balkema, 2001. [10] L. J. Lorig and P. Varona, “Practical slope stability analysis using numerical methods,” in Slope Stability 2000, 2000.

Editorial & Review Transparency

Publication Date

6/3/2026

Peer Review Type

Double-Blind Peer Review

Review Rounds: 2

Documents

Review Report (Confidential)
Copyright Form (Office)

Article Metrics & Impact

Article Views

0

Total views since publication

PDF Downloads

3

Total downloads since publication

Geographic Reach

5

Indexing, Archiving & Preservation

Google Scholar
Academia
ResearchGate
Crossref
SSRN
Semantic Scholar
Thomson Reuters
WorldCat
Mendeley
OpenAlex
EBSCO
Zenodo

Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.

Ethics, Compliance & Transparency

Plagiarism Screening

This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.

Conflict of Interest

The authors declare no conflict of interest related to this research work.

Funding Information

No funding information available for this research.

Similar & Recommended Articles

Similar Articles by Topic

Related research in the same subject area

Loading similar articles...