Crossref DOIMemberCiteFactoropen accessissn
SJIF Impact Factor 8.659 | ISSN: 2582-3930
IJSREM Logo

International Journal of Scientific Research in Engineering and Management

(Gateway to Global Scholars - An International, Scholarly, Multi-Disciplinary, Open Access Journal)

Peer-Reviewed Journal Designed to Meet UGC's Quality Parameters

HomeCurrent IssuePast IssuesPay OnlineConferencesEditorial BoardAbout UsContact Us
IJSREM

Loading article...

Follow Us

  • Google Scholar
  • ResearchGate
  • Academia.edu
  • Mendeley
  • LinkedIn
  • Facebook
  • Instagram

Journal Policies

  • Peer Review Policy
  • Publication Ethics
  • Copyright Infringement
  • Refund & Cancellation Policy
  • Terms and Conditions
  • Privacy Policy

Journal Identifiers & Licenses

  • ISSN Verified: 2582-3930ISSN Verified: 2582-3930
  • Crossref DOI: 10.55041Crossref DOI: 10.55041
  • SJIF Ranking: 08.659SJIF Ranking: 08.659
  • Licensed under CC BY 4.0Licensed under CC BY 4.0
  • ISO Certification: 9001:2015ISO Certification: 9001:2015
  • Indexed & Cited In: Google ScholarIndexed & Cited In: Google Scholar

Contact Us

International Journal of Scientific Research in Engineering and Management (IJSREM)

#62/1, New No 7, 1st Cross, 2nd Main, Ganganagar, R T Nagar, Bangalore North, Bangalore, Karnataka, India – 560032
[email protected]+91 93911 67991
logos
logos
Working Hours

Mon – Sat: 9:00 AM – 6:00 PM

Sunday: 10:00 AM – 4:00 PM

+91 93911 67991

© 2026 IJSREM – International Journal of Scientific Research in Engineering and Management. This is an open-access journal. Articles are published under the Creative Commons Attribution (CC BY 4.0) License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

DisclaimerPrivacy PolicyTerms and Conditions
ArticlePeer ReviewedOpen AccessPlagiarism Passed
Paper ID:10.55041/IJSREM26565

Exploring the Cable-Stayed Bridge with Shifting the Cable Arrangement at Deck Level

Stream/Area:

-

Subject:

-

Paper ID:

10.55041/IJSREM26565

Volume:

7 |

11 |

Nov 2023

Pages:

Publication Frequency:

Monthly (12 issues per year)

DOI
Digital Object Identifier
Not assigned

License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.

Share this article:

Authors

AGY

Anand Gaurav Yadav

PY

Prince Yadav

Author Services & Downloads

Full Articles

Abstract

Cable stayed bridges are becoming a more and more viable option for lengthy spans with the development of computer-based optimisation techniques. Additionally, because they are suspended structures, they can be constructed with ease in locations where it would be challenging to provide several foundations or piers. The pre-tensioning forces of the cables on Sikkim’s Akkar Bridge have been determined through this investigation. CSiBridge software is the programme utilised for the investigation. A analysis of the bridge’s several parameters concludes this work. The parametric analysis looks at the deck moment, the bridge’s span-wise reaction, the height of the pylon, and the length of the span in relation to the girder thickness. Also investigated is the impact of superstructure modifications on substructure. Due to a lack of resources, particularly steel, cable stayed bridges were initially created in Germany in the years following World War II. The effective introduction of cable stayed bridges is made feasible by the development of welding processes, advancements in structural analysis, the use of high strength steel, orthotropic type decking, and the previously noted shortage of steel in the years following World War II. Cable stayed bridges were extremely statically indeterminate structures. Electronic computers were essential in determining the precise solution to these extremely indeterminate systems and in analysing the cable stayed bridge. The software CSi Bridge is used to perform the analysis. Three distinct models of cable-stayed bridges have been constructed, each taking into account identical cable configurations under varying situations. Since the cables are arranged on the deck at various angles and attachment locations, their effects may be thoroughly investigated. IRC Class 70R Vehicle load was taken into consideration when taking live loads in accordance with IRC: 6-2017.

KEYWORDS

Cable-stayed Bridge CSiBridge Software IRC -6 Analysis.

Cite This Article

Anand Gaurav Yadav, Prince Yadav, "Exploring the Cable-Stayed Bridge with Shifting the Cable Arrangement at Deck Level," International Journal of Scientific Research in Engineering and Management, vol. 7, no. 11, Nov 2023. https://doi.org/10.55041/IJSREM26565

Full Article/Conclusion

References

Editorial & Review Transparency

Publication Date

7/10/2023

Peer Review Type

Double-Blind Peer Review

Review Rounds: 2

Documents

Review Report (Confidential)
Copyright Form (Office)

Article Metrics & Impact

Article Views

0

Total views since publication

PDF Downloads

1

Total downloads since publication

Geographic Reach

5

Indexing, Archiving & Preservation

Google Scholar
Academia
ResearchGate
Crossref
SSRN
Semantic Scholar
Thomson Reuters
WorldCat
Mendeley
OpenAlex
EBSCO
Zenodo

Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.

Ethics, Compliance & Transparency

Plagiarism Screening

This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.

Conflict of Interest

The authors declare no conflict of interest related to this research work.

Funding Information

No funding information available for this research.

Similar & Recommended Articles

Similar Articles by Topic

Related research in the same subject area

Loading similar articles...