The construction industry often faces challenges such as project delays, cost overruns, poor coordination, and workflow interruptions in residential building projects. This study focuses on the integration of the Last Planner System (LPS) with Primavera P6 to improve lean construction management and project performance. The research aims to develop an integrated framework that combines Primavera’s scheduling capabilities with LPS principles such as look-ahead planning, weekly work planning, constraint analysis, and continuous monitoring. Comparative analysis of projects before and after integration showed improvements in planning reliability, coordination, productivity, and schedule performance. The integrated LPS–Primavera approach reduced workflow interruptions and enhanced overall project efficiency. The study concludes that integrating LPS with Primavera P6 provides an effective method for achieving lean construction objectives and improving the performance of residential building projects.
KEYWORDS
This study examined the integration of the Last Planner System with Primavera P6 for lean construction management in residential building projects. The research identified major limitations of conventional project management practices and developed an integrated framework that combines lean planning principles with advanced scheduling techniques. The implementation of the LPS–Primavera integrated framework improved planning reliability, workflow continuity, stakeholder coordination, and project monitoring. The use of look-ahead planning, weekly work planning, and continuous performance monitoring significantly reduced workflow interruptions and improved schedule performance. The comparative analysis demonstrated that the integrated approach enhances project productivity and supports better decision-making during construction execution. The findings indicate that integrating LPS with Primavera P6 provides an effective solution for achieving lean construction objectives and improving overall project performance in residential building projects. The developed framework can be adopted by construction organizations to improve project predictability, reduce waste, and enhance operational efficiency through collaborative planning practices.
[1] Ayuba Jerry Likita, Mostafa Babaeian Jelodar, James Olabode Bamidele Rotimi(2025), “ Smart and Sustainable Built Environment”, A guideline for BIM and lean integrated construction practice, Volume 14, Issue 4 [2] Ayuba Jerry Likita, Mostafa Babaeian Jelodar, James Olabode Bamidele Rotimi(2025), “ Construction Innovation: Information, Process, Management ’’, Lean and BIM integration benefits construction management practices in New Zealand, Volume 24, Issue 1 [3] Camilo I. Lagos, Rodrigo F. Herrera, Corresponding Author, Alejandro Mac Cawley, Luis F. Alarcon(2025), “Engineering Construction & Architectural Management”, Prediction of the project schedule performance outcome with the last planner system and social network analysis indicators, Volume 26 [4] Esraa Hyarat, Laura Montalbán-Domingo, Eugenio Pellicer(2024), “Ain Shams Engineering Journal”, Lean constructions barriers in Jordan’s building sub-sector: A comprehensive knowledge framework, Volume 3, Issue 3 [5] Ergo Pikas, Barbara Pedo, Algan Tezel(2022), “Sustainability”, Digital Last Planner System Whiteboard for Enabling Remote Collaborative Design Process Planning and Control, volume 14
Publication Date
5/14/2026
Peer Review Type
Double-Blind Peer Review
Review Rounds: 2
Documents
Article Views
0
Total views since publication
PDF Downloads
3
Total downloads since publication
Geographic Reach
5
Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.
Plagiarism Screening
This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.
Conflict of Interest
The authors declare no conflict of interest related to this research work.
Funding Information
No funding information available for this research.
Related research in the same subject area
Loading similar articles...