Crossref DOIMemberCiteFactoropen accessissn
SJIF Impact Factor 8.659 | ISSN: 2582-3930
IJSREM Logo

International Journal of Scientific Research in Engineering and Management

(Gateway to Global Scholars - An International, Scholarly, Multi-Disciplinary, Open Access Journal)

Peer-Reviewed Journal Designed to Meet UGC's Quality Parameters

HomeCurrent IssuePast IssuesPay OnlineConferencesEditorial BoardAbout UsContact Us
IJSREM

Loading article...

Follow Us

  • Google Scholar
  • ResearchGate
  • Academia.edu
  • Mendeley
  • LinkedIn
  • Facebook
  • Instagram

Journal Policies

  • Peer Review Policy
  • Publication Ethics
  • Copyright Infringement
  • Refund & Cancellation Policy
  • Terms and Conditions
  • Privacy Policy

Journal Identifiers & Licenses

  • ISSN Verified: 2582-3930ISSN Verified: 2582-3930
  • Crossref DOI: 10.55041Crossref DOI: 10.55041
  • SJIF Ranking: 08.659SJIF Ranking: 08.659
  • Licensed under CC BY 4.0Licensed under CC BY 4.0
  • ISO Certification: 9001:2015ISO Certification: 9001:2015
  • Indexed & Cited In: Google ScholarIndexed & Cited In: Google Scholar

Contact Us

International Journal of Scientific Research in Engineering and Management (IJSREM)

#62/1, New No 7, 1st Cross, 2nd Main, Ganganagar, R T Nagar, Bangalore North, Bangalore, Karnataka, India – 560032
[email protected]+91 93911 67991
logos
logos
Working Hours

Mon – Sat: 9:00 AM – 6:00 PM

Sunday: 10:00 AM – 4:00 PM

+91 93911 67991

© 2026 IJSREM – International Journal of Scientific Research in Engineering and Management. This is an open-access journal. Articles are published under the Creative Commons Attribution (CC BY 4.0) License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

DisclaimerPrivacy PolicyTerms and Conditions
ArticlePeer ReviewedOpen AccessPlagiarism Passed
Paper ID:10.55041/IJSREM.FCE025

MICROSOFT PROJECT ENABLED SCHEDULE AND RESOURCE PLANNING IN CONSTRUCTION MANAGEMENT

Stream/Area:

-

Subject:

-

Paper ID:

10.55041/IJSREM.FCE025

Volume:

10 |

8 |

Aug 2026

Pages:

1-17

Publication Frequency:

Monthly (12 issues per year)

DOI
Digital Object Identifier
10.55041/ijsrem.FCE025

License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.

Share this article:

Authors

PD

Prajkta Desai

Civil Engineering

Ashokrao Mane Group of Institutions

Download Author Certificate

Mentors

GNC

Ganesh Namdev Chavan-Patil

Civil Engineering

Ashokrao Mane Group of Institutions

Download Mentor Certificate

Author Services & Downloads

Full ArticlesAcceptance Certificate

Abstract

Construction projects frequently experience schedule slippage and cost escalation when activity dependencies, labour availability, material delivery, site access and subcontractor coordination are not represented in one integrated planning system. This paper develops a Microsoft Project enabled schedule and resource planning framework for a G+13 reinforced concrete residential building project located at Govind Nagar, Nashik, Maharashtra. The study uses genuine case data covering work breakdown structure, structural quantities, labour allocation, activity durations, cost distribution and resource-loaded work packages. The baseline plan gives a project duration of 907.56 days and a planned cost of Rs. 117,055,100.57. A resource-leveled plan is prepared by adjusting task logic, resource calendars, float use, repeated floor cycles, crew continuity, material flow and trade overlap within practical site constraints. The plan reduces project duration to 826.05 days and cost to Rs. 110,458,304.48, giving a saving of 81.51 days or 8.98% and Rs. 6,596,796.09 or 5.64%. The largest duration improvements are obtained in slab casting, RCC frame, lift-core RCC, foundations, masonry and MEP rough-in because these activities have high repetition, high resource intensity and strong influence on critical path continuity. The results confirm that disciplined WBS preparation, critical path tracking, resource leveling and cost-loaded scheduling can improve time-cost performance in high-rise residential construction without changing the project scope.

KEYWORDS

Microsoft Project; construction scheduling; resource leveling; critical path method; cost control; G+13 RCC building; resource-loaded schedule

Cite This Article

Prajkta Desai, Ganesh Namdev Chavan-Patil, "MICROSOFT PROJECT ENABLED SCHEDULE AND RESOURCE PLANNING IN CONSTRUCTION MANAGEMENT," International Journal of Scientific Research in Engineering and Management, vol. 10, no. 8, pp. 1-17, Aug 2026. https://doi.org/10.55041/ijsrem.FCE025

Full Article/Conclusion

This paper presents a Microsoft Project enabled schedule and resource planning study for a G+13 RCC residential project. The project baseline duration is 907.56 days with a planned cost of Rs. 117,055,100.57. After resource leveling and revision of activity sequencing, the project duration becomes 826.05 days and the cost becomes Rs. 110,458,304.48. The net saving is 81.51 days or 8.98% in time and Rs. 6,596,796.09 or 5.64% in cost. Activity-wise results show that slab casting gives the highest duration saving of 12.56%, followed by RCC frame at 11.78%, lift-core RCC at 10.20%, foundation at 9.42%, masonry at 9.42% and MEP rough-in at 9.42%. These results demonstrate that disciplined WBS preparation, baseline comparison, critical path review, resource leveling and cost-loaded scheduling can produce measurable improvement in high-rise residential construction planning. The study confirms that reliable project data and practical scheduling control are sufficient to identify time-cost savings without changing the technical scope of work.

References

[1] M. Vahedi Nikbakht, M. Gheibi, H. Montazeri, R. Y. Khaksar, R. Moezzi, and A. Vadiee, "Identification and Ranking of Factors Affecting the Delay Risk of High-Rise Construction Projects Using AHP and VIKOR Methods," Infrastructures, vol. 9, no. 2, p. 24, 2024, doi: 10.3390/infrastructures9020024. [2] A. M. Abdelalim, M. A. El-Rayes, and A. M. Al-Gahtani, "An Analysis of Factors Contributing to Cost Overruns in the Global Construction Industry," Buildings, vol. 15, no. 1, p. 18, 2024, doi: 10.3390/buildings15010018. [3] Y. Alhammadi, M. Alshawi, and S. Al-Gahtani, "Modeling the Causes and Mitigation Measures for Cost Overrun in Building Construction Projects," Buildings, vol. 14, no. 2, p. 487, 2024, doi: 10.3390/buildings14020487. [4] M. M. Aldammak, N. B. Hamzah, and M. A. Khoiry, "Pilot Study on Delay Factors and Solution Strategies in Government Building Projects in Kuwait: Stakeholders' Perspectives Using Confirmatory Factor Analysis," Buildings, vol. 15, no. 14, p. 2420, 2025, doi: 10.3390/buildings15142420. [5] A. Damci, G. Polat, F. D. Akin, and H. Turkoglu, "Use of float consumption rate in resource leveling of construction projects," Frontiers of Engineering Management, vol. 9, no. 1, pp. 135-147, 2022, doi: 10.1007/s42524-020-0118-0. [6] J. C.-W. Lin, Q. Lv, D. Yu, G. Srivastava, and C.-H. Chen, "Adaptive particle swarm optimization model for resource leveling," Evolving Systems, vol. 14, no. 4, pp. 593-604, 2023, doi: 10.1007/s12530-022-09420-w. [7] F. Xie, H. Li, and Z. Xu, "Multi-mode resource-constrained project scheduling with uncertain activity cost," Expert Systems with Applications, vol. 168, p. 114475, 2021, doi: 10.1016/j.eswa.2020.114475. [8] C. Araujo-Rey and M. A. Sebastian, "An Approach to the Analysis of Causes of Delays in Industrial Construction Projects through Planning and Statistical Computing," Sustainability, vol. 13, no. 7, p. 3975, 2021, doi: 10.3390/su13073975. [9] S. Hamad, M. Khan, S. M. Ali, S. Hussain, and L. Zaman, "Optimization of Resources of a Building Project," Engineering Proceedings, vol. 22, no. 1, p. 19, 2022, doi: 10.3390/engproc2022022019. [10] T. Harshavardhan, V. Srinivasa Reddy, P. S. R. P. S. S. S. Vardhani, S. Shrihari, A. H. R. Alawadi, and S. D. Sharma, "Resource Allocation, Scheduling and Planning of a Multi Storeyed Residential Building," E3S Web of Conferences, vol. 391, p. 01217, 2023, doi: 10.1051/e3sconf/202339101217.

Editorial & Review Transparency

Publication Date

8/3/2026

Peer Review Type

Double-Blind Peer Review

Review Rounds: 2

Documents

Review Report (Confidential)
Copyright Form (Office)

Article Metrics & Impact

Article Views

0

Total views since publication

PDF Downloads

1

Total downloads since publication

Geographic Reach

5

Indexing, Archiving & Preservation

Google Scholar
Academia
ResearchGate
Crossref
SSRN
Semantic Scholar
Thomson Reuters
WorldCat
Mendeley
OpenAlex
EBSCO
Zenodo

Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.

Ethics, Compliance & Transparency

Plagiarism Screening

This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.

Conflict of Interest

The authors declare no conflict of interest related to this research work.

Funding Information

No funding information available for this research.

Similar & Recommended Articles

Similar Articles by Topic

Related research in the same subject area

Loading similar articles...