Loading article...
Loading article...
Stream/Area:
-
Subject:
-
Paper ID:
10.55041/IJSREM.FCE025
Volume:
10 |
8 |
Aug 2026
Pages:
1-17
Publication Frequency:
Monthly (12 issues per year)
License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.
Civil Engineering
Ashokrao Mane Group of Institutions
Civil Engineering
Ashokrao Mane Group of Institutions
Construction projects frequently experience schedule slippage and cost escalation when activity dependencies, labour availability, material delivery, site access and subcontractor coordination are not represented in one integrated planning system. This paper develops a Microsoft Project enabled schedule and resource planning framework for a G+13 reinforced concrete residential building project located at Govind Nagar, Nashik, Maharashtra. The study uses genuine case data covering work breakdown structure, structural quantities, labour allocation, activity durations, cost distribution and resource-loaded work packages. The baseline plan gives a project duration of 907.56 days and a planned cost of Rs. 117,055,100.57. A resource-leveled plan is prepared by adjusting task logic, resource calendars, float use, repeated floor cycles, crew continuity, material flow and trade overlap within practical site constraints. The plan reduces project duration to 826.05 days and cost to Rs. 110,458,304.48, giving a saving of 81.51 days or 8.98% and Rs. 6,596,796.09 or 5.64%. The largest duration improvements are obtained in slab casting, RCC frame, lift-core RCC, foundations, masonry and MEP rough-in because these activities have high repetition, high resource intensity and strong influence on critical path continuity. The results confirm that disciplined WBS preparation, critical path tracking, resource leveling and cost-loaded scheduling can improve time-cost performance in high-rise residential construction without changing the project scope.
KEYWORDS
This paper presents a Microsoft Project enabled schedule and resource planning study for a G+13 RCC residential project. The project baseline duration is 907.56 days with a planned cost of Rs. 117,055,100.57. After resource leveling and revision of activity sequencing, the project duration becomes 826.05 days and the cost becomes Rs. 110,458,304.48. The net saving is 81.51 days or 8.98% in time and Rs. 6,596,796.09 or 5.64% in cost. Activity-wise results show that slab casting gives the highest duration saving of 12.56%, followed by RCC frame at 11.78%, lift-core RCC at 10.20%, foundation at 9.42%, masonry at 9.42% and MEP rough-in at 9.42%. These results demonstrate that disciplined WBS preparation, baseline comparison, critical path review, resource leveling and cost-loaded scheduling can produce measurable improvement in high-rise residential construction planning. The study confirms that reliable project data and practical scheduling control are sufficient to identify time-cost savings without changing the technical scope of work.
[1] M. Vahedi Nikbakht, M. Gheibi, H. Montazeri, R. Y. Khaksar, R. Moezzi, and A. Vadiee, "Identification and Ranking of Factors Affecting the Delay Risk of High-Rise Construction Projects Using AHP and VIKOR Methods," Infrastructures, vol. 9, no. 2, p. 24, 2024, doi: 10.3390/infrastructures9020024. [2] A. M. Abdelalim, M. A. El-Rayes, and A. M. Al-Gahtani, "An Analysis of Factors Contributing to Cost Overruns in the Global Construction Industry," Buildings, vol. 15, no. 1, p. 18, 2024, doi: 10.3390/buildings15010018. [3] Y. Alhammadi, M. Alshawi, and S. Al-Gahtani, "Modeling the Causes and Mitigation Measures for Cost Overrun in Building Construction Projects," Buildings, vol. 14, no. 2, p. 487, 2024, doi: 10.3390/buildings14020487. [4] M. M. Aldammak, N. B. Hamzah, and M. A. Khoiry, "Pilot Study on Delay Factors and Solution Strategies in Government Building Projects in Kuwait: Stakeholders' Perspectives Using Confirmatory Factor Analysis," Buildings, vol. 15, no. 14, p. 2420, 2025, doi: 10.3390/buildings15142420. [5] A. Damci, G. Polat, F. D. Akin, and H. Turkoglu, "Use of float consumption rate in resource leveling of construction projects," Frontiers of Engineering Management, vol. 9, no. 1, pp. 135-147, 2022, doi: 10.1007/s42524-020-0118-0. [6] J. C.-W. Lin, Q. Lv, D. Yu, G. Srivastava, and C.-H. Chen, "Adaptive particle swarm optimization model for resource leveling," Evolving Systems, vol. 14, no. 4, pp. 593-604, 2023, doi: 10.1007/s12530-022-09420-w. [7] F. Xie, H. Li, and Z. Xu, "Multi-mode resource-constrained project scheduling with uncertain activity cost," Expert Systems with Applications, vol. 168, p. 114475, 2021, doi: 10.1016/j.eswa.2020.114475. [8] C. Araujo-Rey and M. A. Sebastian, "An Approach to the Analysis of Causes of Delays in Industrial Construction Projects through Planning and Statistical Computing," Sustainability, vol. 13, no. 7, p. 3975, 2021, doi: 10.3390/su13073975. [9] S. Hamad, M. Khan, S. M. Ali, S. Hussain, and L. Zaman, "Optimization of Resources of a Building Project," Engineering Proceedings, vol. 22, no. 1, p. 19, 2022, doi: 10.3390/engproc2022022019. [10] T. Harshavardhan, V. Srinivasa Reddy, P. S. R. P. S. S. S. Vardhani, S. Shrihari, A. H. R. Alawadi, and S. D. Sharma, "Resource Allocation, Scheduling and Planning of a Multi Storeyed Residential Building," E3S Web of Conferences, vol. 391, p. 01217, 2023, doi: 10.1051/e3sconf/202339101217.
Publication Date
8/3/2026
Peer Review Type
Double-Blind Peer Review
Review Rounds: 2
Documents
Article Views
0
Total views since publication
PDF Downloads
1
Total downloads since publication
Geographic Reach
5
Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.
Plagiarism Screening
This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.
Conflict of Interest
The authors declare no conflict of interest related to this research work.
Funding Information
No funding information available for this research.
Related research in the same subject area
Loading similar articles...