Crossref DOIMemberCiteFactoropen accessissn
SJIF Impact Factor 8.659 | ISSN: 2582-3930
IJSREM Logo

International Journal of Scientific Research in Engineering and Management

(Gateway to Global Scholars - An International, Scholarly, Multi-Disciplinary, Open Access Journal)

Peer-Reviewed Journal Designed to Meet UGC's Quality Parameters

HomeCurrent IssuePast IssuesPay OnlineConferencesEditorial BoardAbout UsContact Us
IJSREM

Loading article...

Follow Us

  • Google Scholar
  • ResearchGate
  • Academia.edu
  • Mendeley
  • LinkedIn
  • Facebook
  • Instagram

Journal Policies

  • Peer Review Policy
  • Publication Ethics
  • Copyright Infringement
  • Refund & Cancellation Policy
  • Terms and Conditions
  • Privacy Policy

Journal Identifiers & Licenses

  • ISSN Verified: 2582-3930ISSN Verified: 2582-3930
  • Crossref DOI: 10.55041Crossref DOI: 10.55041
  • SJIF Ranking: 08.659SJIF Ranking: 08.659
  • Licensed under CC BY 4.0Licensed under CC BY 4.0
  • ISO Certification: 9001:2015ISO Certification: 9001:2015
  • Indexed & Cited In: Google ScholarIndexed & Cited In: Google Scholar

Contact Us

International Journal of Scientific Research in Engineering and Management (IJSREM)

#62/1, New No 7, 1st Cross, 2nd Main, Ganganagar, R T Nagar, Bangalore North, Bangalore, Karnataka, India – 560032
[email protected]+91 93911 67991
logos
logos
Working Hours

Mon – Sat: 9:00 AM – 6:00 PM

Sunday: 10:00 AM – 4:00 PM

+91 93911 67991

© 2026 IJSREM – International Journal of Scientific Research in Engineering and Management. This is an open-access journal. Articles are published under the Creative Commons Attribution (CC BY 4.0) License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

DisclaimerPrivacy PolicyTerms and Conditions
ArticlePeer ReviewedOpen AccessPlagiarism Passed
Paper ID:IJSREM68204

Optimization of Quality Performance in Building Projects Through Lean Construction Practices

Stream/Area:

-

Subject:

-

Paper ID:

IJSREM68204

Volume:

10 |

10 |

Oct 2026

Pages:

1-11

Publication Frequency:

Monthly (12 issues per year)

DOI
Digital Object Identifier
10.55041/IJSREM68204

License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.

Share this article:

Authors

YRS

Yogita Ratan Sawandre

Civil Engineering

Pillai HOC College of Engineering and Technology

Download Author Certificate

Mentors

DMS

Dr. Madhulika Sinha

Civil Engineering

Pillai HOC College of Engineering and Technology

Download Mentor Certificate

Author Services & Downloads

Full ArticlesAcceptance Certificate

Abstract

Construction quality is affected not only by inspection and material compliance but also by the reliability of planning, coordination, information flow, material delivery, and execution processes. This paper examines the relationship between Lean Construction practices and quality performance in selected RERA-registered residential building projects. The study reported questionnaire responses from 100 construction professionals and used site-based checklists to support interpretation of reported practices. Descriptive statistics were used to assess implementation and quality indicators; internal consistency was assessed using Cronbach’s alpha; and Pearson correlation and multiple regression were reported to examine the relationship between Lean practices and quality performance. The questionnaire contained 40 items and achieved a reported Cronbach’s alpha of 0.976. Lean Construction and quality performance were strongly positively correlated (r = 0.852, p < 0.01). The report further gives a regression R² of 0.785 and identifies the Last Planner System (β = 0.641) and Just-In-Time practices (β = 0.261) as influential predictors, while Value Management was not statistically significant as a direct predictor. The lowest mean among selected implementation indicators was 3.65 for value engineering during planning/design, highlighting an improvement opportunity. These findings support stronger collaborative planning, readiness checks, material-flow coordination, and final-stage compliance management. Because the design is observational and cross-sectional, the results establish association rather than causal effect.

KEYWORDS

Lean Construction construction quality Last Planner System Just-In-Time rework residential building projects Pearson correlation multiple regression.

Cite This Article

Yogita Ratan Sawandre, Dr. Madhulika Sinha, "Optimization of Quality Performance in Building Projects Through Lean Construction Practices," International Journal of Scientific Research in Engineering and Management, vol. 10, no. 10, pp. 1-11, Oct 2026. https://doi.org/10.55041/IJSREM68204

Full Article/Conclusion

This paper examined reported evidence on Lean Construction practices and quality performance in selected residential building projects. The source report describes 100 respondents and a 40-item questionnaire with Cronbach’s alpha of 0.976. It reports a strong positive Lean–Quality correlation (r = 0.852, p < 0.01) and a regression R² of 0.785. LPS (β = 0.641) and JIT (β = 0.261) are identified as the more influential reported predictors, while VM was not statistically significant as a direct predictor. Descriptive findings show comparatively high ratings for early defect identification and timely corrective action, but a lower score for final client/statutory compliance (mean = 3.68). Value engineering at planning/design has the lowest selected implementation mean (3.65), making it a practical area for improvement. Overall, stronger planning reliability, work-readiness controls, material-flow coordination, early value engineering, workforce training, and final-stage documentation are recommended. Further publication should include the complete regression output, raw-data reproducibility details, and formal diagnostics. The study supports a strong association between Lean practices and quality outcomes, while causal claims require longitudinal or experimental evidence.

References

[1] H. Erol, I. Dikmen, and M. T. Birgonul, “Measuring the impact of lean construction practices on project duration and variability: A simulation-based study on residential buildings,” Journal of Civil Engineering and Management, vol. 23, no. 2, pp. 241–251, 2017, doi: 10.3846/13923730.2015.1068846. [2] L. Diaz, M. de Oliveira, P. Pucharelli, and J. Pinzon, “Integration between the Last Planner System and the Quality Management System applied in the civil construction industry,” Revista Ingeniería de Construcción, vol. 34, no. 2, pp. 146–158, 2019, doi: 10.4067/S0718-50732019000200146. [3] P. V. Ramani and L. K. Lingan, “Application of lean in construction using value stream mapping,” Engineering, Construction and Architectural Management, vol. 28, no. 1, pp. 216–228, 2021, doi: 10.1108/ECAM-12-2018-0572. [4] E. N. Shaqour, “The impact of adopting lean construction in Egypt: Level of knowledge, application, and benefits,” Ain Shams Engineering Journal, vol. 13, no. 2, Art. no. 101551, 2022, doi: 10.1016/j.asej.2021.07.005. [5] A. M. Eldeep, M. A. M. Farag, and L. M. Abd El-hafez, “Using BIM as a lean management tool in construction processes—A case study,” Ain Shams Engineering Journal, vol. 13, no. 2, Art. no. 101556, 2022, doi: 10.1016/j.asej.2021.07.009. [6] K. El Mounla, D. Beladjine, K. Beddiar, and B. Mazari, “Lean-BIM approach for improving the performance of a construction project in the design phase,” Buildings, vol. 13, no. 3, Art. no. 654, 2023, doi: 10.3390/buildings13030654. [7] M. J. Maraqa, R. Sacks, and S. Spatari, “Quantitative assessment of the impacts of BIM and lean on process and operations flow in construction projects,” Engineering, Construction and Architectural Management, vol. 28, no. 8, pp. 2176–2198, 2021, doi: 10.1108/ECAM-12-2020-1068. [8] C. Z. Li, V. W. Y. Tam, M. Hu, and Y. Zhou, “Lean construction management: A catalyst for evaluating and enhancing prefabricated building project performance in China,” Journal of Building Engineering, vol. 94, Art. no. 109930, 2024, doi: 10.1016/j.jobe.2024.109930. [9] M. Aslam, E. Baffoe-Twum, M. Ahmed, and A. Ulhaq, “Unveiling effectiveness of lean construction practices: A comprehensive study through surveys and case studies,” Civil Engineering Journal, vol. 10, no. 4, pp. 1145–1158, 2024, doi: 10.28991/CEJ-2024-010-04-09. [10] S. Moradi and P. Sormunen, “Implementing lean construction: A literature study of barriers, enablers, and implications,” Buildings, vol. 13, no. 2, Art. no. 556, 2023, doi: 10.3390/buildings13020556.

Editorial & Review Transparency

Publication Date

10/22/2026

Peer Review Type

Double-Blind Peer Review

Review Rounds: 2

Documents

Review Report (Confidential)
Copyright Form (Office)

Article Metrics & Impact

Article Views

1

Total views since publication

PDF Downloads

4

Total downloads since publication

Geographic Reach

5

Indexing, Archiving & Preservation

Google Scholar
Academia
ResearchGate
Crossref
SSRN
Semantic Scholar
Thomson Reuters
WorldCat
Mendeley
OpenAlex
EBSCO
Zenodo

Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.

Ethics, Compliance & Transparency

Plagiarism Screening

This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.

Conflict of Interest

The authors declare no conflict of interest related to this research work.

Funding Information

No funding information available for this research.

Similar & Recommended Articles

Similar Articles by Topic

Related research in the same subject area

Loading similar articles...