Crossref DOIMemberCiteFactoropen accessissn
SJIF Impact Factor 8.659 | ISSN: 2582-3930
IJSREM Logo

International Journal of Scientific Research in Engineering and Management

(Gateway to Global Scholars - An International, Scholarly, Multi-Disciplinary, Open Access Journal)

Peer-Reviewed Journal Designed to Meet UGC's Quality Parameters

HomeCurrent IssuePast IssuesPay OnlineConferencesEditorial BoardAbout UsContact Us
IJSREM

Loading article...

Follow Us

  • Google Scholar
  • ResearchGate
  • Academia.edu
  • Mendeley
  • LinkedIn
  • Facebook
  • Instagram

Journal Policies

  • Peer Review Policy
  • Publication Ethics
  • Copyright Infringement
  • Refund & Cancellation Policy
  • Terms and Conditions
  • Privacy Policy

Journal Identifiers & Licenses

  • ISSN Verified: 2582-3930ISSN Verified: 2582-3930
  • Crossref DOI: 10.55041Crossref DOI: 10.55041
  • SJIF Ranking: 08.659SJIF Ranking: 08.659
  • Licensed under CC BY 4.0Licensed under CC BY 4.0
  • ISO Certification: 9001:2015ISO Certification: 9001:2015
  • Indexed & Cited In: Google ScholarIndexed & Cited In: Google Scholar

Contact Us

International Journal of Scientific Research in Engineering and Management (IJSREM)

#62/1, New No 7, 1st Cross, 2nd Main, Ganganagar, R T Nagar, Bangalore North, Bangalore, Karnataka, India – 560032
[email protected]+91 93911 67991
logos
logos
Working Hours

Mon – Sat: 9:00 AM – 6:00 PM

Sunday: 10:00 AM – 4:00 PM

+91 93911 67991

© 2026 IJSREM – International Journal of Scientific Research in Engineering and Management. This is an open-access journal. Articles are published under the Creative Commons Attribution (CC BY 4.0) License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

DisclaimerPrivacy PolicyTerms and Conditions
ArticlePeer ReviewedOpen AccessPlagiarism Passed
Paper ID:IJSREM17057

Optimizing Facility Layout & Material Flow Logistics for Productivity Enhancement: A Systematic Engineering Approach

Stream/Area:

-

Subject:

-

Paper ID:

IJSREM17057

Volume:

6 |

12 |

Dec 2022

Pages:

1-7

Publication Frequency:

Monthly (12 issues per year)

DOI
Digital Object Identifier
10.55041/IJSREM17057

License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.

Share this article:

Authors

VT

Vandana Tiwari

Mechanical Engineering

Govt. Polytechnic College, Sanawad

Download Author Certificate

Author Services & Downloads

Full ArticlesAcceptance Certificate

Abstract

Shorter material routes create an opportunity for productivity improvement, but output increases only when released time benefits a capacity constraint. This paper develops a deterministic bottleneck model for a xyz small-scale manufacturing unit using a fully disclosed synthetic dataset. Existing and improved layout scenarios share seven process areas, six workers, and an eight-hour paid shift. At a reference workload of 240 units, the associated route-and-time model releases 41.07 handling labour minutes per shift. The productivity model separately assumes that 35 min of bottleneck starvation are eliminated while intrinsic processing speed, staffing, and yield remain constant. Gross output consequently increases from 240 to 266 whole units per shift, a 10.83% gain. At a fixed 98% yield, expected acceptable output increases from 235.20 to 260.68 units, and paid labour productivity rises from 4.90 to 5.43 acceptable units per labour-hour. Sensitivity analysis shows that no output gain occurs when the recovered time fails to reach the bottleneck; demand and downstream capacity also cap the benefit. Higher output partially offsets the reduction in total daily transport. The study’s contribution is an explicit, auditable connection between layout-related handling savings and conditional throughput improvement. The findings are illustrative analytical results, not measured production achievements.

KEYWORDS

labour productivity; material flow; workplace layout; bottleneck; small-scale manufacturing; capacity analysis

Cite This Article

Vandana Tiwari, "Optimizing Facility Layout & Material Flow Logistics for Productivity Enhancement: A Systematic Engineering Approach," International Journal of Scientific Research in Engineering and Management, vol. 6, no. 12, pp. 1-7, Dec 2022. https://doi.org/10.55041/IJSREM17057

Full Article/Conclusion

This is a synthetic analytical study, not an implemented manufacturing case. The main limitation is the assumed connection between reduced handling and reduced starvation. The conversion factor is exposed precisely because it cannot be inferred from route distance alone. The model does not reproduce dispatch timing, competing jobs, buffer blocking, or worker task precedence, and therefore does not validate a feasible detailed schedule. The capacity constraints are fixed gross-unit ceilings for a single product. A changing product mix, sequence-dependent setup, equipment failure, or variable yield could alter the bottleneck. The partial-batch calculation improves the handling estimate but still assigns identical load-and-unload time to full and partial containers. This is a conservative simplification of fixed dispatch work rather than a measured service-time function. Under the stated assumptions, reducing bottleneck starvation from 70 to 35 min raises whole-unit output from 240 to 266 per shift. Expected acceptable output increases from 235.20 to 260.68 units, while paid labour productivity increases from 4.90 to 5.43 units per labour-hour. The gain disappears when no handling saving benefits the bottleneck and is constrained by demand and downstream capacity. The principal conclusion is that layout improvement creates productivity potential, while flow synchronization determines whether that potential is realized. A defensible productivity model must disclose the time-conversion assumption, retain quality and labour denominators, and recalculate logistics at the resulting output. This approach produces a narrower but more interpretable claim than assigning output gains directly from a distance-reduction percentage. Data availability. The model inputs and calculation rules are reported in the methods and tables. All results can be reproduced from the disclosed dataset.

References

Anjos, M. F., & Vieira, M. V. C. (2017). Mathematical optimization approaches for facility layout problems: The state-of-the-art and future research directions. European Journal of Operational Research, 261(1), 1–16. https://doi.org/10.1016/j.ejor.2017.01.049 Anjos, M. F., & Vieira, M. V. C. (2021). Mathematical optimization approach for facility layout on several rows. Optimization Letters, 15, 9–23. https://doi.org/10.1007/s11590-020-01621-z De Carlo, F., Arleo, M. A., Borgia, O., & Tucci, M. (2013). Layout design for a low capacity manufacturing line: A case study. International Journal of Engineering Business Management, 5, 1–10. https://doi.org/10.5772/56883 Dombrowski, U., & Ernst, S. (2013). Scenario-based simulation approach for layout planning. Procedia CIRP, 12, 354–359. https://doi.org/10.1016/j.procir.2013.09.061 Hosseini-Nasab, H., Fereidouni, S., Fatemi Ghomi, S. M. T., & Fakhrzad, M. B. (2018). Classification of facility layout problems: A review study. The International Journal of Advanced Manufacturing Technology, 94, 957–977. https://doi.org/10.1007/s00170-017-0895-8 Jayachitra, R., & Prasad, P. S. S. (2010). Design and selection of facility layout using simulation and design of experiments. Indian Journal of Science and Technology, 3(4), 437–446. https://doi.org/10.17485/ijst/2010/v3i4.20 Kikolski, M., & Ko, C.-H. (2018). Facility layout design—Review of current research directions. Engineering Management in Production and Services, 10(3), 70–79. https://doi.org/10.2478/emj-2018-0018 Pérez-Gosende, P., Mula, J., & Díaz-Madroñero, M. (2021). Facility layout planning. An extended literature review. International Journal of Production Research, 59(12), 3777–3816. https://doi.org/10.1080/00207543.2021.1897176 Pourvaziri, H., Pierreval, H., & Marian, H. (2021). Integrating facility layout design and aisle structure in manufacturing systems: Formulation and exact solution. European Journal of Operational Research, 290(2), 499–513. https://doi.org/10.1016/j.ejor.2020.08.012

Editorial & Review Transparency

Publication Date

12/28/2022

Peer Review Type

Double-Blind Peer Review

Review Rounds: 2

Documents

Review Report (Confidential)
Copyright Form (Office)

Article Metrics & Impact

Article Views

0

Total views since publication

PDF Downloads

2

Total downloads since publication

Geographic Reach

5

Indexing, Archiving & Preservation

Google Scholar
Academia
ResearchGate
Crossref
SSRN
Semantic Scholar
Thomson Reuters
WorldCat
Mendeley
OpenAlex
EBSCO
Zenodo

Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.

Ethics, Compliance & Transparency

Plagiarism Screening

This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.

Conflict of Interest

The authors declare no conflict of interest related to this research work.

Funding Information

No funding information available for this research.

Similar & Recommended Articles

Similar Articles by Topic

Related research in the same subject area

Loading similar articles...