Crossref DOIMemberCiteFactoropen accessissn
SJIF Impact Factor 8.659 | ISSN: 2582-3930
IJSREM Logo

International Journal of Scientific Research in Engineering and Management

(Gateway to Global Scholars - An International, Scholarly, Multi-Disciplinary, Open Access Journal)

Peer-Reviewed Journal Designed to Meet UGC's Quality Parameters

HomeCurrent IssuePast IssuesPay OnlineConferencesEditorial BoardAbout UsContact Us
IJSREM

Loading article...

Follow Us

  • Google Scholar
  • ResearchGate
  • Academia.edu
  • Mendeley
  • LinkedIn
  • Facebook
  • Instagram

Journal Policies

  • Peer Review Policy
  • Publication Ethics
  • Copyright Infringement
  • Refund & Cancellation Policy
  • Terms and Conditions
  • Privacy Policy

Journal Identifiers & Licenses

  • ISSN Verified: 2582-3930ISSN Verified: 2582-3930
  • Crossref DOI: 10.55041Crossref DOI: 10.55041
  • SJIF Ranking: 08.659SJIF Ranking: 08.659
  • Licensed under CC BY 4.0Licensed under CC BY 4.0
  • ISO Certification: 9001:2015ISO Certification: 9001:2015
  • Indexed & Cited In: Google ScholarIndexed & Cited In: Google Scholar

Contact Us

International Journal of Scientific Research in Engineering and Management (IJSREM)

#62/1, New No 7, 1st Cross, 2nd Main, Ganganagar, R T Nagar, Bangalore North, Bangalore, Karnataka, India – 560032
[email protected]+91 93911 67991
logos
logos
Working Hours

Mon – Sat: 9:00 AM – 6:00 PM

Sunday: 10:00 AM – 4:00 PM

+91 93911 67991

© 2026 IJSREM – International Journal of Scientific Research in Engineering and Management. This is an open-access journal. Articles are published under the Creative Commons Attribution (CC BY 4.0) License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

DisclaimerPrivacy PolicyTerms and Conditions
ArticlePeer ReviewedOpen AccessPlagiarism Passed
Paper ID:10.55041/IJSREM27863

OPTIMIZING RESOURCE ALLOCATION AND SCHEDULING IN CONSTRUCTION PROJECTS USING AI & OPTIMIZATION ALGORITHMS

Stream/Area:

-

Subject:

-

Paper ID:

10.55041/IJSREM27863

Volume:

8 |

1 |

Jan 2024

Pages:

Publication Frequency:

Monthly (12 issues per year)

DOI
Digital Object Identifier
10.55041/IJSREM27863

License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.

Share this article:

Authors

SA

S. Abishek

MPP

Mr. P.A. Prabakaran

MAAb

Mr. A. Aswin bharath

MSv

Ms. Sindhu vaardhini

Author Services & Downloads

Full Articles

Abstract

The importance of effective resource allocation and scheduling in construction projects cannot be overstated, as these elements greatly influence project timelines and costs. Traditional manual methods are often slow and error-prone, leading to inefficiencies and delays. As a result, there’s an increasing interest in harnessing artificial intelligence (AI) and optimization algorithms to improve the accuracy and efficiency of resource management in construction projects. Resource allocation, which involves assigning and scheduling resources, is crucial for the economical and efficient use of manpower, materials, and equipment throughout the project. Similarly, a construction schedule acts as a guide, detailing tasks and events along with their respective timelines. This study investigates how the combination of AI and optimization algorithms can transform conventional construction project management methods. By automating resource allocation, AI systems can analyze large datasets and consider various constraints to make informed decisions. Optimization algorithms can then fine-tune these decisions, ensuring optimal resource allocation, reducing downtime, and enhancing project efficiency. This approach offers several advantages, including improved accuracy in predicting resource requirements, fewer project delays, and increased cost-effectiveness. It also allows for real-time adjustments based on evolving project conditions, facilitating adaptive and responsive resource management. Through case studies and practical applications, this research seeks to showcase the transformative power of AI and optimization algorithms in reshaping resource allocation and scheduling practices in the construction industry. In conclusion, this innovative method has the potential to expedite project timelines, reduce costs, and enhance the overall success of construction projects.

KEYWORDS

Resource allocation Artificial intelligence Time-consuming Project delays Minimizing costs Optimization Algorithm.

Cite This Article

S. Abishek, Mr. P.A. Prabakaran, Mr. A. Aswin bharath, Ms. Sindhu vaardhini, "OPTIMIZING RESOURCE ALLOCATION AND SCHEDULING IN CONSTRUCTION PROJECTS USING AI & OPTIMIZATION ALGORITHMS," International Journal of Scientific Research in Engineering and Management, vol. 8, no. 1, Jan 2024. https://doi.org/10.55041/IJSREM27863

Full Article/Conclusion

References

Editorial & Review Transparency

Publication Date

12/31/45292

Peer Review Type

Double-Blind Peer Review

Review Rounds: 2

Documents

Review Report (Confidential)
Copyright Form (Office)

Article Metrics & Impact

Article Views

1

Total views since publication

PDF Downloads

32

Total downloads since publication

Geographic Reach

5

Indexing, Archiving & Preservation

Google Scholar
Academia
ResearchGate
Crossref
SSRN
Semantic Scholar
Thomson Reuters
WorldCat
Mendeley
OpenAlex
EBSCO
Zenodo

Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.

Ethics, Compliance & Transparency

Plagiarism Screening

This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.

Conflict of Interest

The authors declare no conflict of interest related to this research work.

Funding Information

No funding information available for this research.

Similar & Recommended Articles

Similar Articles by Topic

Related research in the same subject area

Loading similar articles...