Loading article...
Loading article...
Stream/Area:
-
Subject:
-
Paper ID:
IJSREM69237
Volume:
10 |
11 |
Nov 2026
Pages:
1-17
Publication Frequency:
Monthly (12 issues per year)
License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.

MTech. (Civil) Construction Engineering and Management
BIRLA VISHVAKARMA MAHAVIDYALAYA ENGINEERING COLLEGE
Professor, PG Coordinator, Construction Engineering and Management, Civil Engineering Department
BIRLA VISHVAKARMA MAHAVIDYALAYA ENGINEERING COLLEGE
Head of Civil Engineering Department
BIRLA VISHVAKARMA MAHAVIDYALAYA ENGINEERING COLLEGE
Engineer, Proprietor
Jay Maharaj Construction, Karamsad, Vidyanagar Road, Vallabh Vidyanagar
Assembly arrangements communicate ongoing uncertainty on the cost, agenda and safety outcomes, and deterministic planning instruments misapply that uncertainty. The present study summarizes twenty surveys that concern probabilistic liability appraisal (PRA) and Monte Carlo simulation (MCS) in building and related technologies, which shows how the field has evolved from a normal risk management approach model to a simulation-based portfolio-type risk quantification. The major aim here is to establish the core within the six theme areas: cost and schedule liability functions, safety risk objectives, resilience and fragility model, PRA/dynamic-PRA methodological taxonomy, deterministic versus probabilistic AI approach, and the reappraisal and foundation of risk management. Monte Carlo simulation with built-in threat register, Time-at-Risk quantiles, and risk-matrix-informed allocation choice, together and sequentially exceed Single-Point deterministic estimations, especially where comparatively large sample sizes diminish traditional statistical evaluation. The synthesis matrix and figures from this page describe the scope of the research, the implementation method, and possible dissemination of the results, indicating that Program Evaluation and Review Technique (Beta-PERT) and triangular distribution dominate the agenda objectives, while risk matrix-derived distributions generate data for cost purposes. The objective of this study is to summarize the end point by recognizing the shortcomings, limited integration of probabilistic cost, agenda, and adaptability models into one system, minimal real-time knowledge utilization, and uneven treatment of the beneficial side of risk, and to guide the next analysis.
KEYWORDS
In view of the previous literature review, it could be concluded that probabilistic risk assessment, simulations, and resilience are the critical elements in construction project management. As a result- 1. Construction risk is not limited to the likelihood of any of the other integrated risk types of labour, materials, equipment, design, financial, and external shocks that will cause an impact on performance, schedule, and cost of work. 2. The literature review provides an argument for why a probabilistic approach is essential: Limits to Deterministic Planning. There are several likelihoods of probability, with a Monte Carlo simulation or another model-based simulation representing risk as an aggregated projection of the expected work at one point. 3. The synergy of the integration: CPM/PERT network schedule in conjunction with Monte Carlo simulation gives a systematic way to measure activity-level uncertainties, evaluate the potential of schedule delays and cost overruns, and also to highlight the key risk drivers. 4. Some risks do not qualify for calculation, and information regarding them cannot be collected for all risks. Project resilience refers to identifying, anticipating, and responding to disruption and restoring after disruption has occurred, which involves developing well-planned, resource-adaptable, and resourced contingency plans. 5. Future studies, in this review, should generate more integrated and adaptive approaches that construct data-driven models, bringing together probability-based risk outputs and concrete resilience indicators. These are evidenced through the use of case studies, project data, and more validation.
[1] P. Szymański, “Risk management in construction projects,” in Procedia Engineering, Elsevier Ltd, 2017, pp. 174–182. doi: 10.1016/j.proeng.2017.11.036. [2] M. Schieg, “Risk management in construction project management,” Journal of Business Economics and Management, vol. 7, no. 2, pp. 77–83, 2006, doi: 10.1080/16111699.2006.9636126. [3] S. Iqbal, R. M. Choudhry, K. Holschemacher, A. Ali, and J. Tamošaitienė, “Risk management in construction projects,” Technological and Economic Development of Economy, vol. 21, no. 1, pp. 65–78, 2015, doi: 10.3846/20294913.2014.994582. [4] R. Vachheta, M. J. Shah, and J. R. Pitroda, “Ranking the Risks based on its Impact for Redevelopment Projects: A Review,” Studies in Indian Place Names, vol. 40, Issue 60, Mar 2020, ISSN: 2394- 3114. [5] R. C. de Azevedo, L. Ensslin, and A. E. Jungles, “A Review of Risk Management in Construction: Opportunities for Improvement,” Modern Economy, vol. 05, no. 04, pp. 367–383, 2014, doi: 10.4236/me.2014.54036. [6] T. Parhizkar and B. John, “Simulation-based Probabilistic Risk Assessment,” ResearchGate, July 2022, doi: 10.48550/arXiv.2207.12575. [7] H. S. Nejad, T. Parhizkar, B. John, and A. Mosleh, “Simulation-Based Probabilistic Risk Assessment (SIMPRA): Risk-Based Design,” ResearchGate, Sep 2021, doi: 10.48550/arXiv.2110.06806. [8] A. J. Hughes, R. J. Barthorpe, N. Dervilis, C. R. Farrar, and K. Worden, “A probabilistic risk-based decision framework for structural health monitoring,” Mech. Syst. Signal Process., vol. 150, Mar. 2021, doi: 10.1016/j.ymssp.2020.107339. [9] B. A. Armijos De La Cruz, J. R. Castro Esparza, J. F. Leoro Benitez, and W. Y. Armijos De La Cruz, “Leveraging Monte Carlo Simulation for Project Risk Management: A Study on Pre-Mitigation and Post-Mitigation Techniques in Risk Registers,” Ciencia Latina Revista Científica Multidisciplinar, vol. 9, no. 5, pp. 6975–6992, Oct. 2025, doi: 10.37811/cl_rcm. v9i5.20089. [10] H. Hassi, M. El Mkhalet, and N. Lamdouar, “Scheduling Optimization and Risk Analysis Using Monte Carlo Simulation for a Construction Project in Morocco,” International Journal of Engineering Trends and Technology, vol. 73, no. 6, pp. 336–349, Jun. 2025, doi: 10.14445/22315381/IJETT-V73I6P128.
Publication Date
11/19/2026
Peer Review Type
Double-Blind Peer Review
Review Rounds: 2
Documents
Article Views
0
Total views since publication
PDF Downloads
3
Total downloads since publication
Geographic Reach
5
Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.
Plagiarism Screening
This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.
Conflict of Interest
The authors declare no conflict of interest related to this research work.
Funding Information
No funding information available for this research.
Related research in the same subject area
Loading similar articles...