Crossref DOIMemberCiteFactoropen accessissn
SJIF Impact Factor 8.659 | ISSN: 2582-3930
IJSREM Logo

International Journal of Scientific Research in Engineering and Management

(Gateway to Global Scholars - An International, Scholarly, Multi-Disciplinary, Open Access Journal)

Peer-Reviewed Journal Designed to Meet UGC's Quality Parameters

HomeCurrent IssuePast IssuesPay OnlineConferencesEditorial BoardAbout UsContact Us
IJSREM

Loading article...

Follow Us

  • Google Scholar
  • ResearchGate
  • Academia.edu
  • Mendeley
  • LinkedIn
  • Facebook
  • Instagram

Journal Policies

  • Peer Review Policy
  • Publication Ethics
  • Copyright Infringement
  • Refund & Cancellation Policy
  • Terms and Conditions
  • Privacy Policy

Journal Identifiers & Licenses

  • ISSN Verified: 2582-3930ISSN Verified: 2582-3930
  • Crossref DOI: 10.55041Crossref DOI: 10.55041
  • SJIF Ranking: 08.659SJIF Ranking: 08.659
  • Licensed under CC BY 4.0Licensed under CC BY 4.0
  • ISO Certification: 9001:2015ISO Certification: 9001:2015
  • Indexed & Cited In: Google ScholarIndexed & Cited In: Google Scholar

Contact Us

International Journal of Scientific Research in Engineering and Management (IJSREM)

#62/1, New No 7, 1st Cross, 2nd Main, Ganganagar, R T Nagar, Bangalore North, Bangalore, Karnataka, India – 560032
[email protected]+91 93911 67991
logos
logos
Working Hours

Mon – Sat: 9:00 AM – 6:00 PM

Sunday: 10:00 AM – 4:00 PM

+91 93911 67991

© 2026 IJSREM – International Journal of Scientific Research in Engineering and Management. This is an open-access journal. Articles are published under the Creative Commons Attribution (CC BY 4.0) License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

DisclaimerPrivacy PolicyTerms and Conditions
ArticlePeer ReviewedOpen AccessPlagiarism Passed
Paper ID:IJSREM63803

Project Management Using CPM and PERT Techniques

Stream/Area:

-

Subject:

-

Paper ID:

IJSREM63803

Volume:

10 |

5 |

May 2026

Pages:

1-4

Publication Frequency:

Monthly (12 issues per year)

DOI
Digital Object Identifier
10.55041/IJSREM63803

License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.

Share this article:

Authors

Astitva Raj

Astitva Raj

Department of Computer Science and Engineering

Don Bosco Institute of Technology

Download Author Certificate
Gadda Happy

Gadda Happy

Department of Computer Science and Engineering

Don Bosco Institute of Technology

Download Co-Author Certificate
DNG

Dr. N Guruprasad

Department of Computer Science and Engineering

Don Bosco Institute of Technology

Download Co-Author Certificate
Arsalan Ahmed

Arsalan Ahmed

Department of Computer Science and Engineering

Don Bosco Institute of Technology

Download Co-Author Certificate
Siftainraza J B

Siftainraza J B

Department of Computer Science and Engineering

Don Bosco Institute of Technology

Download Co-Author Certificate

Author Services & Downloads

Acceptance Certificate

Abstract

Project management plays an important role in the success of any project. Traditional methods of project scheduling involve manual computations that may be prone to dependency problems and make it hard to identify critical activities. In this study, a project management application that applies critical path method (CPM) and program evaluation and review technique (PERT) is proposed. This proposed approach aids in computing the duration of the project, identifying the critical path, computing the slack time, and generating program evaluation and review technique (PERT) provides probabilistic time estimation.

KEYWORDS

Keywords- Project Management CPM PERT Network Diagram Critical Path Analysis Slack Calculation.

Cite This Article

Astitva Raj, Gadda Happy, Dr. N Guruprasad, Arsalan Ahmed, Siftainraza J B, "Project Management Using CPM and PERT Techniques," International Journal of Scientific Research in Engineering and Management, vol. 10, no. 5, pp. 1-4, May 2026. https://doi.org/10.55041/IJSREM63803

Full Article/Conclusion

It has been concluded that CPM and PERT method is used to enhance the planning, scheduling and managing of projects properly [1],[10]. CPM method should be use for a project which has activities that take a specified time and well defined, whereas PERT method can be used if the completion time of activities are uncertain [7],[12]. The system developed will allow the calculation of critical paths, ES, EF, LS, LF, slack value and total time of the project accurately [9],[11]. Thus, the system reduces the manual work involved in calculating the value and it make easy for user to check the activities which critical in a network diagram [8]. Therefore, it is clear that the proposed Project Management System is an effective, simple and precise method to manage the project which will have effective impact on managing real-world projects [2],[5].

References

[1] M. Nuhu A., A. Umar, A. Musa (2024). “Application of Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT) in Project Scheduling”, International Journal of Engineering Research and Technology, vol. 13, no. 4, pp. 45–52. [2]  S. Andrewson, R. Mathew, P. George (2025). “Artificial Intelligence Integration with CPM and PERT for Smart Project Scheduling”, Journal of Advanced Project Management, vol. 8, no. 2, pp. 88–97.   [3] M. J. Bianchi, L. Carter, D. Lewis (2022). “Hybrid Project Management Recommendation Framework using Data Mining Techniques”, International Journal of Project Analytics, vol. 11, no. 3, pp. 112–126.   [4] Y. Min, L. Shou-rong (2021). “Analysis of Human Behavioral Factors in Critical Chain and PERT Scheduling”, International Conference on Project Scheduling Systems, pp. 221–228. [5] Y. Yao, H. Zhang, W. Li (2024). “Automated Construction Scheduling using Deep Reinforcement Learning”, Automation in Construction, vol. 162, pp. 104–118,   [6] I. H. Owolabi, S. M. Olarewanju (2026). “Optimization of Construction Scheduling using Critical Path Method”, Nigerian Journal of Engineering and Applied Sciences, vol. 9, no. 1, pp. 31–40. [7] M. A. Jouda, M. A. K. Shiker (2024). “Comparative Analysis of CPM and PERT Techniques in House Construction Projects”, Journal of Engineering and Sustainable Development, vol. 28, no. 2, pp. 76–89.   [8]   D. Fauzah, R. Putri, A. Kurniawan (2024). “Optimization of Construction Project Scheduling using CPM and PERT Methods”, International Journal of Civil Engineering and Technology, vol. 15, no. 5, pp. 144–156. [9] Y. Ren, X. Liu, P. Wang (2020). “Application of Critical Path Method in Software Project Scheduling”, International Journal of Software Engineering and Applications, vol. 10, no. 4, pp. 55–67.   [10]  K. B. Bagshaw (2021). “Review of Project Management using PERT and CPM Techniques”, Journal of Management and Engineering Integration, vol. 6, no. 3, pp. 90–101.

Editorial & Review Transparency

Publication Date

5/22/2026

Peer Review Type

Double-Blind Peer Review

Review Rounds: 2

Documents

Review Report (Confidential)
Copyright Form (Office)

Article Metrics & Impact

Article Views

4

Total views since publication

PDF Downloads

0

Total downloads since publication

Geographic Reach

5

Indexing, Archiving & Preservation

Google Scholar
Academia
ResearchGate
Crossref
SSRN
Semantic Scholar
Thomson Reuters
WorldCat
Mendeley
OpenAlex
EBSCO
Zenodo

Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.

Ethics, Compliance & Transparency

Plagiarism Screening

This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.

Conflict of Interest

The authors declare no conflict of interest related to this research work.

Funding Information

No funding information available for this research.

Similar & Recommended Articles

Similar Articles by Topic

Related research in the same subject area

Loading similar articles...