Crossref DOIMemberCiteFactoropen accessissn
SJIF Impact Factor 8.659 | ISSN: 2582-3930
IJSREM Logo

International Journal of Scientific Research in Engineering and Management

(Gateway to Global Scholars - An International, Scholarly, Multi-Disciplinary, Open Access Journal)

Peer-Reviewed Journal Designed to Meet UGC's Quality Parameters

HomeCurrent IssuePast IssuesPay OnlineConferencesEditorial BoardAbout UsContact Us
IJSREM

Loading article...

Follow Us

  • Google Scholar
  • ResearchGate
  • Academia.edu
  • Mendeley
  • LinkedIn
  • Facebook
  • Instagram

Journal Policies

  • Peer Review Policy
  • Publication Ethics
  • Copyright Infringement
  • Refund & Cancellation Policy
  • Terms and Conditions
  • Privacy Policy

Journal Identifiers & Licenses

  • ISSN Verified: 2582-3930ISSN Verified: 2582-3930
  • Crossref DOI: 10.55041Crossref DOI: 10.55041
  • SJIF Ranking: 08.659SJIF Ranking: 08.659
  • Licensed under CC BY 4.0Licensed under CC BY 4.0
  • ISO Certification: 9001:2015ISO Certification: 9001:2015
  • Indexed & Cited In: Google ScholarIndexed & Cited In: Google Scholar

Contact Us

International Journal of Scientific Research in Engineering and Management (IJSREM)

#62/1, New No 7, 1st Cross, 2nd Main, Ganganagar, R T Nagar, Bangalore North, Bangalore, Karnataka, India – 560032
[email protected]+91 93911 67991
logos
logos
Working Hours

Mon – Sat: 9:00 AM – 6:00 PM

Sunday: 10:00 AM – 4:00 PM

+91 93911 67991

© 2026 IJSREM – International Journal of Scientific Research in Engineering and Management. This is an open-access journal. Articles are published under the Creative Commons Attribution (CC BY 4.0) License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

DisclaimerPrivacy PolicyTerms and Conditions
ArticlePeer ReviewedOpen AccessPlagiarism Passed
Paper ID:IJSREM48589

Reimagining Project Timelines: A Framework for Timely Delivery in Real Estate

Stream/Area:

-

Subject:

-

Paper ID:

IJSREM48589

Volume:

9 |

5 |

May 2025

Pages:

Publication Frequency:

Monthly (12 issues per year)

DOI
Digital Object Identifier
10.55041/IJSREM48589

License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.

Share this article:

Authors

YDI

Yashraj Dhiraj Ingole

Author Services & Downloads

Full Articles

Abstract

In the construction of systems in houses, time overruns are veritably pivotal factors which are related to cost, satisfaction of affected stakeholders and the completion of the design on schedule. This exploration establishes that the main factors leading to design detainments are as follows factors related to detainments in carrying necessary blessings or warrants, redesigns, lack of finances, shy number of workers, and ineffective construction operation. The exploration uses a multipurpose approach, empirical studies through literature reviews and stakeholder interviews, to address the linked enterprises and formulate an applicable result frame. The proposed frame considers the factors like enhancing design pretensions, operation of interest groups, and searching for advancements of work processes or operation of new technologies. Aimed at practicable recommendations, this study is anticipated to contribute to the enhancement of design completion in real estate sector and reduce the time and further sustainable practices within the sector

KEYWORDS

Time overrun real estate delays project lifecycle optimization mitigation strategies construction project efficiency.

Cite This Article

Yashraj Dhiraj Ingole, "Reimagining Project Timelines: A Framework for Timely Delivery in Real Estate," International Journal of Scientific Research in Engineering and Management, vol. 9, no. 5, May 2025. https://doi.org/10.55041/IJSREM48589

Full Article/Conclusion

References

Editorial & Review Transparency

Publication Date

5/23/2025

Peer Review Type

Double-Blind Peer Review

Review Rounds: 2

Documents

Review Report (Confidential)
Copyright Form (Office)

Article Metrics & Impact

Article Views

1

Total views since publication

PDF Downloads

2

Total downloads since publication

Geographic Reach

5

Indexing, Archiving & Preservation

Google Scholar
Academia
ResearchGate
Crossref
SSRN
Semantic Scholar
Thomson Reuters
WorldCat
Mendeley
OpenAlex
EBSCO
Zenodo

Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.

Ethics, Compliance & Transparency

Plagiarism Screening

This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.

Conflict of Interest

The authors declare no conflict of interest related to this research work.

Funding Information

No funding information available for this research.

Similar & Recommended Articles

Similar Articles by Topic

Related research in the same subject area

Loading similar articles...