Crossref DOIMemberCiteFactoropen accessissn
SJIF Impact Factor 8.659 | ISSN: 2582-3930
IJSREM Logo

International Journal of Scientific Research in Engineering and Management

(Gateway to Global Scholars - An International, Scholarly, Multi-Disciplinary, Open Access Journal)

Peer-Reviewed Journal Designed to Meet UGC's Quality Parameters

HomeCurrent IssuePast IssuesPay OnlineConferencesEditorial BoardAbout UsContact Us
IJSREM

Loading article...

Follow Us

  • Google Scholar
  • ResearchGate
  • Academia.edu
  • Mendeley
  • LinkedIn
  • Facebook
  • Instagram

Journal Policies

  • Peer Review Policy
  • Publication Ethics
  • Copyright Infringement
  • Refund & Cancellation Policy
  • Terms and Conditions
  • Privacy Policy

Journal Identifiers & Licenses

  • ISSN Verified: 2582-3930ISSN Verified: 2582-3930
  • Crossref DOI: 10.55041Crossref DOI: 10.55041
  • SJIF Ranking: 08.659SJIF Ranking: 08.659
  • Licensed under CC BY 4.0Licensed under CC BY 4.0
  • ISO Certification: 9001:2015ISO Certification: 9001:2015
  • Indexed & Cited In: Google ScholarIndexed & Cited In: Google Scholar

Contact Us

International Journal of Scientific Research in Engineering and Management (IJSREM)

#62/1, New No 7, 1st Cross, 2nd Main, Ganganagar, R T Nagar, Bangalore North, Bangalore, Karnataka, India – 560032
[email protected]+91 93911 67991
logos
logos
Working Hours

Mon – Sat: 9:00 AM – 6:00 PM

Sunday: 10:00 AM – 4:00 PM

+91 93911 67991

© 2026 IJSREM – International Journal of Scientific Research in Engineering and Management. This is an open-access journal. Articles are published under the Creative Commons Attribution (CC BY 4.0) License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

DisclaimerPrivacy PolicyTerms and Conditions
ArticlePeer ReviewedOpen AccessPlagiarism Passed
Paper ID:10.55041/IJSREM24340

RESOURCE LEVELLING OF G+4 BUILDING BY REMODIFIED MINIMUM MOMENT METHOD

Stream/Area:

-

Subject:

-

Paper ID:

10.55041/IJSREM24340

Volume:

7 |

7 |

Jul 2023

Pages:

Publication Frequency:

Monthly (12 issues per year)

DOI
Digital Object Identifier
Not assigned

License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.

Share this article:

Authors

PP

Prof. P.K.Lende

MD

Mayavati Damke

Author Services & Downloads

Full Articles

Abstract

This study includes the Re modified minimum moment method of resource levelling to construction projects. The method is based upon the critical path method & it was developed with the assumption of no activity splitting and fixed project duration with unlimited availability of resources. The criteria of selecting the activity that has to be shifted from its original position to a better position is judged by the change in the statically moment of the resource histogram before and after such movement as well as by Resource Improvement Coefficient. To achieve the objectives of the study, the data of residential construction projects is taken. Initially the activities are arranged according to their EST then as per the Re modified minimum moment method & as per their LFT. Bar chart & histogram is prepared for each solution. Maximum daily requirement of mason, moment of histogram & RIC are calculated for each solution from the respective histograms. These values are then compared for each solution. It has been observed that Maximum daily requirement of mason, moment of histogram & RIC are reduced by Re modified minimum moment method.

KEYWORDS

Cite This Article

Prof. P.K.Lende, Mayavati Damke, "RESOURCE LEVELLING OF G+4 BUILDING BY REMODIFIED MINIMUM MOMENT METHOD," International Journal of Scientific Research in Engineering and Management, vol. 7, no. 7, Jul 2023. https://doi.org/10.55041/IJSREM24340

Full Article/Conclusion

References

Editorial & Review Transparency

Publication Date

3/6/2023

Peer Review Type

Double-Blind Peer Review

Review Rounds: 2

Documents

Review Report (Confidential)
Copyright Form (Office)

Article Metrics & Impact

Article Views

0

Total views since publication

PDF Downloads

2

Total downloads since publication

Geographic Reach

5

Indexing, Archiving & Preservation

Google Scholar
Academia
ResearchGate
Crossref
SSRN
Semantic Scholar
Thomson Reuters
WorldCat
Mendeley
OpenAlex
EBSCO
Zenodo

Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.

Ethics, Compliance & Transparency

Plagiarism Screening

This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.

Conflict of Interest

The authors declare no conflict of interest related to this research work.

Funding Information

No funding information available for this research.

Similar & Recommended Articles

Similar Articles by Topic

Related research in the same subject area

Loading similar articles...