Crossref DOIMemberCiteFactoropen accessissn
SJIF Impact Factor 8.659 | ISSN: 2582-3930
IJSREM Logo

International Journal of Scientific Research in Engineering and Management

(Gateway to Global Scholars - An International, Scholarly, Multi-Disciplinary, Open Access Journal)

Peer-Reviewed Journal Designed to Meet UGC's Quality Parameters

HomeCurrent IssuePast IssuesPay OnlineConferencesEditorial BoardAbout UsContact Us
IJSREM

Loading article...

Follow Us

  • Google Scholar
  • ResearchGate
  • Academia.edu
  • Mendeley
  • LinkedIn
  • Facebook
  • Instagram

Journal Policies

  • Peer Review Policy
  • Publication Ethics
  • Copyright Infringement
  • Refund & Cancellation Policy
  • Terms and Conditions
  • Privacy Policy

Journal Identifiers & Licenses

  • ISSN Verified: 2582-3930ISSN Verified: 2582-3930
  • Crossref DOI: 10.55041Crossref DOI: 10.55041
  • SJIF Ranking: 08.659SJIF Ranking: 08.659
  • Licensed under CC BY 4.0Licensed under CC BY 4.0
  • ISO Certification: 9001:2015ISO Certification: 9001:2015
  • Indexed & Cited In: Google ScholarIndexed & Cited In: Google Scholar

Contact Us

International Journal of Scientific Research in Engineering and Management (IJSREM)

#62/1, New No 7, 1st Cross, 2nd Main, Ganganagar, R T Nagar, Bangalore North, Bangalore, Karnataka, India – 560032
[email protected]+91 93911 67991
logos
logos
Working Hours

Mon – Sat: 9:00 AM – 6:00 PM

Sunday: 10:00 AM – 4:00 PM

+91 93911 67991

© 2026 IJSREM – International Journal of Scientific Research in Engineering and Management. This is an open-access journal. Articles are published under the Creative Commons Attribution (CC BY 4.0) License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

DisclaimerPrivacy PolicyTerms and Conditions
ArticlePeer ReviewedOpen AccessPlagiarism Passed
Paper ID:IJSREM49221

Risk Register Automation using Stacked Generalization

Stream/Area:

-

Subject:

-

Paper ID:

IJSREM49221

Volume:

9 |

5 |

May 2025

Pages:

Publication Frequency:

Monthly (12 issues per year)

DOI
Digital Object Identifier
10.55041/IJSREM49221

License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.

Share this article:

Authors

PR

Punya R

DVK

Dr. Vanishree K

Author Services & Downloads

Full Articles

Abstract

This paper proposes a hybrid ML/DL approach for automating compliance risk register generation. A stacked generalization model is built using Random Forest, Logistic Regression, and MLP as base learners, combined via a meta-learner to improve risk classification. The system is trained on synthetic compliance data and utilizes encoding and normalization for preprocessing. Integrated with a Streamlit dashboard, the model provides real-time risk prediction with confidence scores, enabling efficient and accurate compliance risk management. Experimental results demonstrate superior performance compared to individual models, achieving 94.2% accuracy in risk categorization with reduced false positive rates. The system incorporates automated risk scoring mechanisms that adapt to evolving compliance landscapes, while maintaining interpretability through feature importance analysis and uncertainty quantification. Additionally, the framework supports multi-jurisdictional compliance requirements and provides automated reporting capabilities for audit trails and regulatory documentation. The ensemble approach leverages the complementary strengths of traditional machine learning and deep learning techniques to enhance prediction robustness across diverse risk scenarios.

KEYWORDS

Risk Register Stacked Generalization Stacked Generalization Compliance Risk Classification Synthetic Data Machine Learning Deep Learning Streamlit Dashboard Risk Prediction.

Cite This Article

Punya R, Dr. Vanishree K, "Risk Register Automation using Stacked Generalization," International Journal of Scientific Research in Engineering and Management, vol. 9, no. 5, May 2025. https://doi.org/10.55041/IJSREM49221

Full Article/Conclusion

References

Editorial & Review Transparency

Publication Date

5/31/2025

Peer Review Type

Double-Blind Peer Review

Review Rounds: 2

Documents

Review Report (Confidential)
Copyright Form (Office)

Article Metrics & Impact

Article Views

0

Total views since publication

PDF Downloads

2

Total downloads since publication

Geographic Reach

5

Indexing, Archiving & Preservation

Google Scholar
Academia
ResearchGate
Crossref
SSRN
Semantic Scholar
Thomson Reuters
WorldCat
Mendeley
OpenAlex
EBSCO
Zenodo

Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.

Ethics, Compliance & Transparency

Plagiarism Screening

This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.

Conflict of Interest

The authors declare no conflict of interest related to this research work.

Funding Information

No funding information available for this research.

Similar & Recommended Articles

Similar Articles by Topic

Related research in the same subject area

Loading similar articles...