Loading article...
Loading article...
Stream/Area:
-
Subject:
-
Paper ID:
10.55041/IJSREM28904
Volume:
8 |
2 |
Feb 2024
Pages:
Publication Frequency:
Monthly (12 issues per year)
License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.
This paper is about auditing electrical quality in substations. A Fluke 1748 Energy Analyze is used for power quality audits. The quality audit will be performed according to IEEE Standard 519 2022. The specific purpose of power quality is the cleanliness of the power supply, including voltage fluctuations and waveform distortion. Harmonics occurs whenever non-sinusoidal currents and/or voltages are generated in a power system. This is commonly referred to as harmonic distortion. The main conditions that cause harmonic problems in power systems are non-linear loading, phase imbalance, high input voltage or current, and resonance. Electrical energy is key to industry, commerce and development, so maintaining the quality of electricity flow is important. Having power quality indicators is very important when identifying hazards and possible defects in electrical installations.
KEYWORDS
Publication Date
12/31/45351
Peer Review Type
Double-Blind Peer Review
Review Rounds: 2
Documents
Article Views
0
Total views since publication
PDF Downloads
2
Total downloads since publication
Geographic Reach
5
Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.
Plagiarism Screening
This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.
Conflict of Interest
The authors declare no conflict of interest related to this research work.
Funding Information
No funding information available for this research.
Related research in the same subject area
Loading similar articles...