Loading article...
Loading article...
Stream/Area:
-
Subject:
-
Paper ID:
10.55041/IJSREM15267
Volume:
6 |
6 |
Jun 2022
Pages:
Publication Frequency:
Monthly (12 issues per year)
License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.
. The Reclaimed Asphalt Pavement Material (RAP) is obtained from the reclamation process from the bituminous roads, which are not commonly used for further construction, and dumped near the site. The RAP can be used as an aggregate. RAP also contains bitumen binder, which can be utilized in pavement construction. Since a decade plastic waste is used in road construction. Plastic waste safe disposal is also a big challenge to humans for protecting our environment and eco-system. There is no literature or research on the combined uses of RAP with Plastic waste. This project uses two waste materials, Reclaimed Asphalt Pavement Material (RAP) and Plastic waste for the construction of flexible pavement. Designing Dense Bituminous Macadam (DBM) Grading-II, which is now commonly used for flexible pavement on National Highway (NH), and State Highway (SH). Prepared samples with Reclaimed Asphalt Pavement material (RAP) and virgin aggregate, satisfying grading and specifications of aggregate as per MoRTH recommendations using Job mix formula (JMF). Bitumen Grade VG-30 used for binder. Adding Plastic waste as per IRC SP:98 2022[2] on hot aggregate (Dry Process) starting from 6% and increment of 2% up to 12% by weight of Optimum Bitumen Content (OBC). Assuming plastic will function as a binder. Comparing samples properties i.e., density, Marshall stability, flow value, air voids, voids in mineral aggregate, [VMA], and voids filled by bitumen [VFB]. From comparison found that RAP – 25% and Plastic waste 8% has satisfied all criteria of design & showed higher stability. The use of Reclaimed Asphalt Pavement Material (RAP) can save mines and disposal problems. Plastic waste uses in road construction also solves plenty of problems for the environment. The use of both waste materials can reduce the construction cost of the highway project.
KEYWORDS
Publication Date
2/6/2022
Peer Review Type
Double-Blind Peer Review
Review Rounds: 2
Documents
Article Views
0
Total views since publication
PDF Downloads
0
Total downloads since publication
Geographic Reach
5
Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.
Plagiarism Screening
This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.
Conflict of Interest
The authors declare no conflict of interest related to this research work.
Funding Information
No funding information available for this research.
Related research in the same subject area
Loading similar articles...