Crossref DOIMemberCiteFactoropen accessissn
SJIF Impact Factor 8.659 | ISSN: 2582-3930
IJSREM Logo

International Journal of Scientific Research in Engineering and Management

(Gateway to Global Scholars - An International, Scholarly, Multi-Disciplinary, Open Access Journal)

Peer-Reviewed Journal Designed to Meet UGC's Quality Parameters

HomeCurrent IssuePast IssuesPay OnlineConferencesEditorial BoardAbout UsContact Us
IJSREM

Loading article...

Follow Us

  • Google Scholar
  • ResearchGate
  • Academia.edu
  • Mendeley
  • LinkedIn
  • Facebook
  • Instagram

Journal Policies

  • Peer Review Policy
  • Publication Ethics
  • Copyright Infringement
  • Refund & Cancellation Policy
  • Terms and Conditions
  • Privacy Policy

Journal Identifiers & Licenses

  • ISSN Verified: 2582-3930ISSN Verified: 2582-3930
  • Crossref DOI: 10.55041Crossref DOI: 10.55041
  • SJIF Ranking: 08.659SJIF Ranking: 08.659
  • Licensed under CC BY 4.0Licensed under CC BY 4.0
  • ISO Certification: 9001:2015ISO Certification: 9001:2015
  • Indexed & Cited In: Google ScholarIndexed & Cited In: Google Scholar

Contact Us

International Journal of Scientific Research in Engineering and Management (IJSREM)

#62/1, New No 7, 1st Cross, 2nd Main, Ganganagar, R T Nagar, Bangalore North, Bangalore, Karnataka, India – 560032
[email protected]+91 93911 67991
logos
logos
Working Hours

Mon – Sat: 9:00 AM – 6:00 PM

Sunday: 10:00 AM – 4:00 PM

+91 93911 67991

© 2026 IJSREM – International Journal of Scientific Research in Engineering and Management. This is an open-access journal. Articles are published under the Creative Commons Attribution (CC BY 4.0) License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

DisclaimerPrivacy PolicyTerms and Conditions
ArticlePeer ReviewedOpen AccessPlagiarism Passed
Paper ID:IJSREM25976

WORK BREAKDOWN STRUCTURE IN PROJECT MANAGEMENT WITH SOFT LOGICS

Stream/Area:

-

Subject:

-

Paper ID:

IJSREM25976

Volume:

7 |

10 |

Oct 2023

Pages:

Publication Frequency:

Monthly (12 issues per year)

DOI
Digital Object Identifier
Not assigned

License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.

Share this article:

Authors

AS

Akhila S

MS

Mrs. Sujithra.G

Author Services & Downloads

Full Articles

Abstract

This paper presents a Work Breakdown Structure (WBS) based model for repetitive projects when considering soft logic. Previous researches are based on the assumption that work sequence cannot be changed for different work zones. In reality, work sequence between work zones are not fixed (actually, constantly adjusted) throughout the project. Instead, they are often changed to shorten the construction time and minimize the total cost. Scheduling with the non-fixed work sequences between work zones is known as the soft logic method. Considering the soft logic in repetitive projects, the proposed WBS model aims to assist the project team to find the minimum overall cost subjecting to different output rates and logical sequences. The software used in this work is Oracle Primavera P6. Unlike some scheduling software programs that are somewhat of a bottom-up approach, Primavera P6 encourages to create a WBS at the beginning of the project. With the help of soft logic consideration in work breakdown structure of repetitive construction projects the site working team can find the after effect of change in work pattern through various sequence of the proposed work. Primavera P6 software makes it easier to apply that change and also to track the overall progress of the work. Final result clearly shows that planning the work in different pattern, before execution, will help the project manager to select an optimum sequence of work breakdown structure.

KEYWORDS

WBS PRIMAVERA P6 SOFT LOGICS.

Cite This Article

Akhila S, Mrs. Sujithra.G, "WORK BREAKDOWN STRUCTURE IN PROJECT MANAGEMENT WITH SOFT LOGICS," International Journal of Scientific Research in Engineering and Management, vol. 7, no. 10, Oct 2023.

Full Article/Conclusion

References

Editorial & Review Transparency

Publication Date

6/9/2023

Peer Review Type

Double-Blind Peer Review

Review Rounds: 2

Documents

Review Report (Confidential)
Copyright Form (Office)

Article Metrics & Impact

Article Views

0

Total views since publication

PDF Downloads

1

Total downloads since publication

Geographic Reach

5

Indexing, Archiving & Preservation

Google Scholar
Academia
ResearchGate
Crossref
SSRN
Semantic Scholar
Thomson Reuters
WorldCat
Mendeley
OpenAlex
EBSCO
Zenodo

Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.

Ethics, Compliance & Transparency

Plagiarism Screening

This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.

Conflict of Interest

The authors declare no conflict of interest related to this research work.

Funding Information

No funding information available for this research.

Similar & Recommended Articles

Similar Articles by Topic

Related research in the same subject area

Loading similar articles...