Crossref DOIMemberCiteFactoropen accessissn
SJIF Impact Factor 8.659 | ISSN: 2582-3930
IJSREM Logo

International Journal of Scientific Research in Engineering and Management

(Gateway to Global Scholars - An International, Scholarly, Multi-Disciplinary, Open Access Journal)

Peer-Reviewed Journal Designed to Meet UGC's Quality Parameters

HomeCurrent IssuePast IssuesPay OnlineConferencesEditorial BoardAbout UsContact Us
IJSREM

Loading article...

Follow Us

  • Google Scholar
  • ResearchGate
  • Academia.edu
  • Mendeley
  • LinkedIn
  • Facebook
  • Instagram

Journal Policies

  • Peer Review Policy
  • Publication Ethics
  • Copyright Infringement
  • Refund & Cancellation Policy
  • Terms and Conditions
  • Privacy Policy

Journal Identifiers & Licenses

  • ISSN Verified: 2582-3930ISSN Verified: 2582-3930
  • Crossref DOI: 10.55041Crossref DOI: 10.55041
  • SJIF Ranking: 08.659SJIF Ranking: 08.659
  • Licensed under CC BY 4.0Licensed under CC BY 4.0
  • ISO Certification: 9001:2015ISO Certification: 9001:2015
  • Indexed & Cited In: Google ScholarIndexed & Cited In: Google Scholar

Contact Us

International Journal of Scientific Research in Engineering and Management (IJSREM)

#62/1, New No 7, 1st Cross, 2nd Main, Ganganagar, R T Nagar, Bangalore North, Bangalore, Karnataka, India – 560032
[email protected]+91 93911 67991
logos
logos
Working Hours

Mon – Sat: 9:00 AM – 6:00 PM

Sunday: 10:00 AM – 4:00 PM

+91 93911 67991

© 2026 IJSREM – International Journal of Scientific Research in Engineering and Management. This is an open-access journal. Articles are published under the Creative Commons Attribution (CC BY 4.0) License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

DisclaimerPrivacy PolicyTerms and Conditions
ArticlePeer ReviewedOpen AccessPlagiarism Passed
Paper ID:10.55041/IJSREM34476

Revitalizing Reservoirs Nitrogen Kick-off Techniques for Re-activating Inactive Wells

Stream/Area:

-

Subject:

-

Paper ID:

10.55041/IJSREM34476

Volume:

8 |

5 |

May 2024

Pages:

Publication Frequency:

Monthly (12 issues per year)

DOI
Digital Object Identifier
10.55041/IJSREM34476

License:International Journal of Scientific Research in Engineering and Management follows the Creative Commons Attribution 4.0 (CC BY 4.0) License, allowing free use and distribution with proper attribution.

Share this article:

Authors

ARG

Appala Raju Gali

V

V.V.Srimannarayana

Author Services & Downloads

Full Articles

Abstract

This study explores the use of nitrogen (N2) injection to rejuvenate inactive wells and enhance reservoir productivity. We analyze the mechanism of N2 injection and its effectiveness in stimulating production from dormant wells through case studies and field applications. Our findings highlight the cost-effectiveness and environmental benefits of N2 kickoff in extending the life of mature reservoirs and maximizing hydrocarbon recovery. By examining operational conditions such as gas injection rate and pressure, we identify optimal conditions using Wellflo® simulations. Key factors like water cut, reservoir pressure, gas oil ratio, and productivity index (J) are considered to predict production outcomes. A new metric, the Optimum Economic Factor (OEF), assesses the efficiency of each operation based on production rate, operation length, and nitrogen usage. Our decision matrix, incorporating all examined factors, reveals trends: higher gas injection rates are needed for wells with higher water cut, lower gas oil ratio, lower productivity index, and lower reservoir pressure. We also studied the effects of wellhead pressure, well depth, and coiled tubing size, finding increased frictional pressure gradients with larger coiled tubing. Optimizing nitrogen unloading operations can significantly reduce costs, particularly by paying for coiled tubing packages on an hourly basis instead of daily rates. Our decision matrix facilitates planning and execution, optimizing nitrogen usage and reducing manpower requirements. Overall, our study demonstrates that proper optimization can make nitrogen unloading economically viable in mature oil fields.

KEYWORDS

Cite This Article

Appala Raju Gali, V.V.Srimannarayana, "Revitalizing Reservoirs Nitrogen Kick-off Techniques for Re-activating Inactive Wells," International Journal of Scientific Research in Engineering and Management, vol. 8, no. 5, May 2024. https://doi.org/10.55041/IJSREM34476

Full Article/Conclusion

References

Editorial & Review Transparency

Publication Date

12/31/45433

Peer Review Type

Double-Blind Peer Review

Review Rounds: 2

Documents

Review Report (Confidential)
Copyright Form (Office)

Article Metrics & Impact

Article Views

0

Total views since publication

PDF Downloads

1

Total downloads since publication

Geographic Reach

5

Indexing, Archiving & Preservation

Google Scholar
Academia
ResearchGate
Crossref
SSRN
Semantic Scholar
Thomson Reuters
WorldCat
Mendeley
OpenAlex
EBSCO
Zenodo

Digital Preservation: This article is permanently archived on Zenodo and complies with all data preservation standards across major indexing platforms.

Ethics, Compliance & Transparency

Plagiarism Screening

This manuscript has been checked for plagiarism using TurnitinPlagiarismChecker software.

Conflict of Interest

The authors declare no conflict of interest related to this research work.

Funding Information

No funding information available for this research.

Similar & Recommended Articles

Similar Articles by Topic

Related research in the same subject area

Loading similar articles...